700 Entri Tambahan Nama OrangMuhammad Salman, supervisor; Ridwan Jalal, supervisor
001 Hak Akses (open/membership)
336 Content Typetext (rdacontent)
710 Entri Tambahan Badan KorporasiUniversitas Indonesia. Fakultas Teknik
264b Nama PenerbitFakultas Teknik Universitas Indonesia
852 LokasiPerpustakaan UI
504 Catatan Bibliografipage 91
049 No. Barkod21-21-038163287
338 Carrier Typeonline resource (rdacarrier)
590 Cat. Sumber Pengadaan Koleksi
903 Stock Opname
Tahun Buka Akses2020
053 No. Induk21-21-038163287
653 Kata Kunciproduction optimization; gas compressors; pressure; scenario; supply; sustainable
040 Sumber PengataloganLibUI ind rda
245 Judul UtamaOptimasi Produksi Lanjut Lapangan Gas KB, Sengkang, Sulawesi Selatan = The Further Production Optimizations of KB Gas Field, Sengkang, South Sulawesi
650 Subyek TopikGas field chemicals industry; Gas field
264c Tahun Terbit2020
850 Lembaga PemilikUniversitas Indonesia
904b Pemeriksa Lembar Kerja
520 Ringkasan/Abstrak/IntisariPotensi penurunan produksi pada lapangan gas ditandai dengan penurunan tekanan secara alamiah yang merupakan indikator dari lapangan yang sudah tua (mature), seperti yang dialami oleh Lapangan Gas KB sehingga perlu dilakukan optimasi produksi untuk menyesuaikan dan memberikan strategi manajemen reservoir gas agar produksi gas dapat berkesinambungan sampai akhir kontrak wilayah kerja Blok Sengkang. Optimasi produksi yang akan dilakukan adalah pemasangan jenis gas compressors berbasis tekanan yang ditentukan untuk mencari skenario terbaik pengembangan lapangan gas yang dievaluasi teknis dengan analisis sistem produksi, sehingga skenario yang terpilih diharapkan memberikan kemampuan penyaluran gas kepada pembeli secara berkelanjutan. Diharapkan skenario optimasi produksi tersebut mampu mencegah potensi kerugian yang akan datang pada perusahaan guna mempertahankan volume penyerahan gas yang sesuai dengan kontrak demi menjaga pendapatan perusahaan.
A potential decline in production at gas fields marked with a pressure drop naturally which is an indicator of the field are mature, as experienced by the KB Gas Field that needs to be optimized in production to adjust and provide the strategies of gas reservoir management so that gas production can be sustainable until the work area contract of Sengkang Block end. Production Optimization that will be applied is the gas compressors installation based on pressure is determined to find the best scenario of gas field development which is evaluated by the production systems analysis so that the chosen scenario is expected to provide a gas supply ability to buyers in a sustainable manner. A scenario of production optimization is expected to be able to prevent the potential losses that will come in the company to maintain the gas delivery volume under the contract and also maintain a revenue of the company.
090 No. Panggil SetempatPR-pdf
d-Entri Utama Nama OrangMuhammad Nur Agus Cahyana, author
500 Catatan UmumTidak dapat diakses di UIANA, karena: data yang digunakan untuk penulisan berasal dari instansi tertentu yang bersifat konfidensial.
337 Media Typecomputer (rdamedia)
d-Entri Tambahan Nama OrangMuhammad Salman ; Belum Terdaftar
526 Catatan Informasi Program StudiArsitektur
100 Entri Utama Nama OrangMuhammad Nur Agus Cahyana, author
264a Kota TerbitDepok
300 Deskripsi Fisikxv, 117 pages : illustration ; appendix