700 Entri Tambahan Nama OrangSunaryo, supervisor; Hendri Dwi Saptioratri Budiono, examiner
001 Hak Akses (open/membership)membership
336 Content Typetext (rdacontent)
710 Entri Tambahan Badan KorporasiUniversitas Indonesia. Fakultas Teknik
264b Nama PenerbitFakultas Teknik Universitas Indonesia
504 Catatan Bibliografi
852 LokasiPerpustakaan UI
049 No. Barkod21-24-36821699
338 Carrier Typeonline resource (rdacarrier)
590 Cat. Sumber Pengadaan Koleksi
903 Stock Opname
534 Catatan Versi Asli
Tahun Buka Akses2060
053 No. Induk21-24-36821699
653 Kata Kuncitopside; loadout; integrated topside module; longitudinal strength analysis
040 Sumber PengataloganLibUI ind rda
245 Judul UtamaPerhitungan Kapasitas Hull Bending dan Gaya Geser Kondisi Loadout ITM (Integrated Topside Module) dari Quayside Sampai Posisi Final Diatas Hull = Hull Bending and Sheer Capacity Check for ITM Loadout from Quayside to Final Position on Hull Main Deck
650 Subyek TopikNatural gas.
264c Tahun Terbit2023
850 Lembaga PemilikUniversitas Indonesia
520 Ringkasan/Abstrak/IntisariPembangunan fasilitas pemprosesan migas terapung di Indonesia ini dapat meningkatkan pasokan gas dalam negri dan meningkatkan target lifting gas bumi. Proyek ini secara nasional sudah tercatat dan diakui telah melakukan percepatan pengiriman FPU (Floathing Production Unit) untuk sail away 6 bulan lebih awal dari target 4 tahun menjadi 3.5 tahun dan penghematan biaya yang cukup besar. Strategi untuk melakukan percepatan tersebut dengan melakukan fabrikasi dan Engineering Hull, LQ dan Topside Module secara bersamaan di lokasi yang berbeda. Engineering dan Fabrikasi Hull dan LQ dilakukan di Korea Selatan dan Topside Module dilakukan di Karimum Yard, Kepulauan Riau. Dalam laporan Praktik Keinsinyuran ini, Penulis akan mengambil sebagian kecil dari analisa yang telah dilakukan yaitu proses loadout ITM (Integrated Topside Module) ke atas Hull. Analisa pada Praktik Keinsinyuran ini adalah perhitungan maksimum kekuatan memanjang Hull, kondisi SWSF dan SWBM yang terjadi pada saat ITM load ditrasfer ke Hull dengan mempertimbangan 2 ketinggian pasang surut air laut. Hasil perhitungan SWBM dan SWSF menunjukan nilai yang terjadi ketika load transfer dibawah dari allowable maksimum nilai yang diizinkan oleh DNV Class dan internal standard perusahaan. 1. Maksimum SWBM yang terjadi adalah +119968 Ton.m (Hogging) dan nilai ini dibawah toleransi yang diizinkan +299000 Ton.m. 2. Maksimum SWSF yang terjadi pada saat loadout adalah -6179.6 Ton (negatif) yang terjadi di Frame 23. Nilai tersebut masih dibawah toleransi yang diizinkan -7000 Ton ......The new construction offshore floating oil and gas processing facilities in Indonesia could increase domestic gas supplies and increase natural gas lifting targets. This completed project recorded and recognized nationally as one of accelerated project which ready to sail away and delivered FPU (Floating Production Unit) 6 months earlier from the target of 4 years to 3.5 years, hence reduced significantly cost.The strategic plan to accelerate is by performing fabrication and engineering the Hull, LQ and Topside Module simultaneously in different locations. Engineering and Fabrication Hull and LQ performed in South Korea and Complete Topside Module performed at Karimum Yard, Riau Islands. In this part of ?Praktik Keinsinyuran? report, the Author only will take a small part of several analysis that performed previously and focus on Loadout process ITM (Integrated Topside Module) from the jetty to Hull. The analysis will explain and check the maximum longitudinal strength of the Hull SWSF and SWBM conditions that occurred during transfer vertical load ITM to the Hull by considering 2 tidal heights. The summary result shows SWBM and SWSF values within the acceptance criteria by DNV rules and Company internal standard. 1. The maximum calculated SWBM during loadout is +119968 Ton.m (Hogging) at Frame 17 and this maximum value is below the maximum allowable value in +299000 Ton.m. 2. The maximum calculated SWSF during loadout is -6179.6 Tons (negative) at Frame 23 and this value is below the maximum allowable value inof -7000 Tons.
904b Pemeriksa Lembar KerjaAdhityaN-September2024
090 No. Panggil SetempatPR-pdf
d-Entri Utama Nama OrangHerman Saputra, author
500 Catatan UmumTidak dapat diakses di UIANA, karena: data yang digunakan untuk penulisan berasal dari instansi tertentu yang bersifat konfidensial.
337 Media Typecomputer (rdamedia)
d-Entri Tambahan Nama OrangSunaryo
526 Catatan Informasi Program StudiInsinyur
100 Entri Utama Nama OrangHerman Saputra, author
264a Kota TerbitDepok
300 Deskripsi Fisik
904a Pengisi Lembar KerjaAdhityaN-September2024
Akses Naskah Ringkas
856 Akses dan Lokasi Elektronik
502 Catatan Jenis KaryaProfesi
041 Kode Bahasaind