700 Entri Tambahan Nama Orang | Leni Sagita Riantini, supervisor; Rossy Armyn Machfudiyanto, supervisor; Wisnu Isvara, examiner; M. Ichsan Damiat, examiner; Rosmariani Ariffudin, examiner |
001 Hak Akses (open/membership) | membership |
336 Content Type | text (rdacontent) |
264b Nama Penerbit | Fakultas Teknik Universitas Indonesia |
710 Entri Tambahan Badan Korporasi | Universitas Indonesia. Fakultas Teknik |
504 Catatan Bibliografi | pages 157-158 |
852 Lokasi | Perpustakaan UI |
049 No. Barkod | 15-25-11182998 |
338 Carrier Type | online resource (rdacarrier) |
590 Cat. Sumber Pengadaan Koleksi | Deposit |
903 Stock Opname | |
534 Catatan Versi Asli | |
Tahun Buka Akses | 2021 |
053 No. Induk | 15-25-11182998 |
653 Kata Kunci | turnaround; maintenance; production loss |
040 Sumber Pengatalogan | LibUI ind rda |
245 Judul Utama | Pengendalian Proyek Turnaround Maintenance Untuk Mengendalikan Kinerja Waktu Proyek = Control of Turnaround Maintenance Project to Control Time Performance of The Project |
650 Subyek Topik | Corporate turnarounds -- Management |
264c Tahun Terbit | 2021 |
850 Lembaga Pemilik | Universitas Indonesia |
520 Ringkasan/Abstrak/Intisari | Proyek pemeliharaan dan turnaround pabrik yang dilakukan secara berkala di pabrik, tidak hanya akan menimbulkan biaya besar dan menghabiskan sumber daya, tetapi juga mengakibatkan hilangnya angka penjualan dari non-operasi pabrik selama pekerjaan proyek pemeliharaan turnaround. Penelitian ini bertujuan untuk mengidentifikasi proses perencanaan pemeliharaan turnaround saat ini yang mungkin berkontribusi pada perpanjangan durasi pekerjaan maintenance turnaround, melakukan pemeringkatan risiko-risiko berpotensi menghambat kinerja waktu proyek turnaround dan menentukan strategi berbasis risk response untuk meningkatkan kinerja waktu proyek. Penelitian mengidentifikasi beberapa aktivitas dalam proyek yang memiliki pengaruh pada kinerja waktu proyek. Risiko pada masing-masing aktivitas tersebut diidentifikasi dengan menggunakan metode kualitatif dan dinilai serta diperingkatkan untuk mendapatkan risiko-risiko yang berperingkat tinggi. Strategi berdasar respon terhadap risiko ditentukan dengan validasi para pakar untuk meningkatkan kinerja waktu proyek. Beberapa strategi berhubungan dengan pengelolaan kontraktor sebagai bagian tidak terpisahkan dari proyek turnaround maintenance. Selain strategi pengelolaan kontraktor, strategi pengelolaan pengadaan long delivery item dan pengelolaan pengadaan sparepart menjadi strategi penting untuk menjaga kinerja waktu proyek turnaround maintenance.
......Maintenance and turnaround projects are carried out regularly at the plant, will not only incur large costs and consume resources, but also result in lost sales figures from non-operation of the plant during the turnaround maintenance project work. This study aims to identify the current turnaround maintenance planning process that may contribute to the extension of the turnaround maintenance work duration, to rank the risks that have the potential to hinder turnaround project time performance and determine a risk response based strategy to improve project time performance. The research identifies several activities in the project that have an influence on project time performance. The risks in each of these activities are identified using qualitative methods and are assessed and ranked to obtain high-ranking risks. The risk response based strategy is determined with expert validation to improve project time performance. Several strategies relate to managing contractors as an integral part of turnaround maintenance projects. In addition to the contractor management strategy, the long delivery item procurement management strategy and spare parts procurement management are important strategies to maintain the turnaround maintenance project time performance. |
904b Pemeriksa Lembar Kerja | Amiarsih Indah Purwiati-Juli 2025 |
090 No. Panggil Setempat | T-pdf |
d-Entri Utama Nama Orang | |
500 Catatan Umum | Tidak dapat diakses di UIANA, karena: akan ditulis dalam bahasa Inggris dan dipresentasikan sebagai makalah pada Seminar Internasional yaitu International Conference on Engineering, Technology and Researches 2021 |
337 Media Type | computer (rdamedia) |
d-Entri Tambahan Nama Orang | |
526 Catatan Informasi Program Studi | Teknik Sipil |
100 Entri Utama Nama Orang | Nendra Gunawan, author |
264a Kota Terbit | Depok |
300 Deskripsi Fisik | 158 pages : illustration + appendix |
904a Pengisi Lembar Kerja | Amiarsih Indah Purwiati-Juli 2025 |
Akses Naskah Ringkas | |
856 Akses dan Lokasi Elektronik | |
502 Catatan Jenis Karya | Tesis |
041 Kode Bahasa | ind |