001 Hak Akses (open/membership)membership
700 Entri Tambahan Nama OrangDwi Marta Nurjaya, supervisor; Jaka Fajar Fatriansyah, examiner; Wahid Muhamad Furkon Rahmatulloh, examiner; Maya Putri Agustianingrum, examiner
336 Content Typetext (rdacontent)
264b Nama PenerbitFakultas Teknik Universitas Indonesia
710 Entri Tambahan Badan KorporasiUniversitas Indonesia. Fakultas Teknik
504 Catatan Bibliografipages 118-121
049 No. Barkod15-25-28174869
852 LokasiPerpustakaan UI
338 Carrier Typeonline resource (rdacarrier)
590 Cat. Sumber Pengadaan KoleksiDeposit;
903 Stock Opname
534 Catatan Versi Asli
Tahun Buka Akses2025
053 No. Induk15-25-28174869
653 Kata Kuncicorrosion under insulation; microbiologically induced corrosion; remaining life; risk-based analysis; under-deposit corrosion
040 Sumber PengataloganLibUI ida rda
245 Judul UtamaPenilaian Integritas Pipa Penyalur pada Shipping Line Menggunakan Risk Based Analysis dalam Menentukan Risiko Serta Strategi Pemeliharaan Pipa Penyalur milik PT XYZ = Integrity Assessment of Shipping Line Pipelines Using Risk-Based Analysis to Determine Risk and Maintenance Strategies
264c Tahun Terbit2024
650 Subyek TopikPipelines--Corrosion--Data processing.
850 Lembaga PemilikUniversitas Indonesia
520 Ringkasan/Abstrak/IntisariPipa penyalur Shipping Line X,Y dan Z berfungsi sangat vital dan merupakan jalur tunggal dalam penyaluran crude oil siap lifting dari area P dan area Z ke titik serah terima penyaluran minyak di area NM. Dalam rangka menjaga operasi serta keamatan pada pipa shipping line maka perlu dilakukan studi terkait dengan integritas serta evaluasi risiko. Penilaian integritas saat ini dilakukan dengan menganalisa data inspeksi, monitoring dan repair untuk mengetahui adanya anomali pada shipping line, serta melakukan perhitungan sisa umur perlatan untuk mengetahui integritas pipa penyalur di masa depan. Penilaian analisa risiko dilakukan dengan menggunakan Risk Based Analysis dimana mengacu kepada Muhlbaeur serta dilakukan beberapa modifikasi dalam menentukan Probability of Failure (POF) dan Consequence of Failure (COF) untuk mendapatkan profil risiko. Simulasi terkait dengan pressure built-up, penurunan temperatur dan wax deposition dilakukan dnegan menggunakan flow assurance analysis untuk mengetahui kondisi aliran fluida pada shipping line. Hasil dari penilaian integritas menunjukkan bahwa pipa Shipping Line X, Y dan Z dalam kondisi fit-for service. Namun hal yang perlu di perhatikan dalam operasi shippping line yaitu terkait dengan mekanisme kerusakan internal yang menjadi ancaman berupa Under Deposit Corrosion (UDC) dan Microbiologically Induced Corrosion (MIC) sedangkan mekanisme kerusakan eksternal yang menjadi ancaman adalah Corrosion Under Insulation (CUI). Hasil dari penilaian integritas pipa shipping line serta analisa risiko sangat krusial dalam menentukan rencana inspeksi dan strategi pemeliharaan jangka pendek, menengah dan panjang. ......Shipping Lines X, Y & Z are classified as critical infrastructure, being the only transportation through the crude oil lifting from P and R location to the transfer station in NM Area. To maintain the workflow of the Shipping Line, integrity assessments and risk evaluation are required to ensure the operational and safety. Anomalies were found by analysing inspection, monitoring, and repair data, while the pipelines' future integrity was assessed by calculating the remaining life. Risk-Based Analysis (RBA), which is a modification of Muhlbaeur's method, is employed to conduct the risk assessment using the Probability of Failure (POF) and Consequence of Failure (COF) in order to develop the risk profile. Simulations of pressure built up, temperature drop, and wax deposition are performed through flow assurance analysis to predict the Shipping Line condition. The results of the integrity assessment show that the Shipping Lines X, Y, and Z is fit-for-service. Nevertheless, some concerns need to be addressed, including active internal degradation mechanisms such as Under Deposit Corrosion (UDC) and Microbiologically Induced Corrosion (MIC), as well as active external threats such as Corrosion Under Insulation (CUI). The result of integrity and risk assessment Shipping Lines X, Y, and Z are crucial for planning inspection schedules and maintenance strategies in short, medium, and long term.
904b Pemeriksa Lembar KerjaAdhityaN-Mei2025
090 No. Panggil SetempatT-pdf
d-Entri Utama Nama Orang
500 Catatan UmumDapat diakses di UIANA (lib.ui.ac.id) saja.
d-Entri Tambahan Nama Orang
337 Media Typecomputer (rdamedia)
526 Catatan Informasi Program StudiManajemen Integritas Material
100 Entri Utama Nama OrangAde Ratih Anggraini, author
264a Kota TerbitDepok
300 Deskripsi Fisikxiv, 121 pages: illustration + appendix
904a Pengisi Lembar KerjaAdhityaN-Mei2025
Akses Naskah Ringkas
856 Akses dan Lokasi Elektronik
502 Catatan Jenis KaryaTesis
041 Kode Bahasaind