UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Faktor resiko dan tindakan koreksi terjadinya keterlambatan waktu dalam pengelolaan subkontraktor pekerjaan finishing pada bangunan gedung bertingkat

Aritonang, Jerry Silado; Yusuf Latief, supervisor (Fakultas Teknik Universitas Indonesia, 2006)

 Abstrak

Pertumbuhan industri jasa konstruksi yang sangat pesat setelah krisis ekonomi tahun 1997 memberikan peranan penting dalam pertumbuhan ekonomi. Hal ini memberikan dampak positif bagi persaingan usaha jasa konstruksi terutama konstruksi bangunan gedung bertingkat di Indonesia. Dimana setiap perusahaan konstruksi yang ingin mengerjakan suatu proyek harus melakukan perencanaan dan pengendalian yang cermat dalam hal metode konstruksi, penjadwalan, pemilihan subkontraktor, biaya material dan sebagainya sehingga semua risiko yang menimbulkan dampak negatif terhadap biaya, waktu dan mutu dapat diminimalkan. Dalam mengantisipasi segala risiko keterlambatan waktu yang sering terjadi pada pelaksanaan pekerjaan konstruksi, dilakukan beberapa cara mengalokasikan risiko dimana salah satunya adalah mengalokasikan kepada subkontraktor spesialis. Akan tetapi masih sering terjadi keterlambatan waktu terutama dalam pelaksanaan pekerjaan finishing lantai dan dinding kulit luar bangunan. Hal ini disebabkan oleh kurang jelinya kontraktor utama dalam mengidentifikasi variabel risiko yang menjadi penyebab keterlambatan waktu penyelesaian pekerjaan tersebut. Mengingat hal tersebut maka dilakukan penelitian untuk mengidentifikasikan sumber risiko serta tindakan koreksi yang harus dilakukan untuk mengeliminir risiko terutama pada pelaksanaan pekerjaan finishing lantai dan dinding kulit luar pada proyek bangunan gedung bertingkat di Jakarta.

Construction industry given significant growth for economic development after monitary crisis in 1997. This sector driven positively effort for the competitiveness in Indonesia construction industry especially in building construction. Every construction company needs to be have a good planning and monitoring for achieving project goals which is cost, time and quality. In order to achieving project goals, they need to control every risks that could be happen usually in construction method, scheduling, material costs, subcontractor performance, etc. In order to maintaining and anticipating the risks in project, they need to allocated the risks by making a contract with subcontractor specialist. Eventhough they give it to the specialist subcontractor, they still have delaying time during construction works. This could be happened because they don?t have good capability to identified the risks, that can make time overrun. This thesis want to tell us about, how to maintain subcontractors performance so they can improve their ability to help main contractor achieving project goals and also giving corrective action list for treating risk factor delaying time during construction works .

 File Digital: 9

Shelf
 T 24379-Faktor resiko-Bibliografi.pdf :: Unduh
 T 24379-Faktor resiko-Pendahuluan.pdf :: Unduh
 T 24379-Faktor resiko-Abstrak.pdf :: Unduh
 T 24379-Faktor resiko-Lampiran.pdf :: Unduh
 T 24379-Faktor resiko-Analisis.pdf :: Unduh
 T 24379-Faktor resiko-Tinjauan literatur.pdf :: Unduh
 T 24379-Faktor resiko-Kesimpulan dan Saran.pdf :: Unduh
 T 24379-Faktor resiko-Metodologi.pdf :: Unduh
 T 24379-Faktor resiko-HA.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T24379
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2006
Bahasa : ind
Sumber Pengatalogan :
Tipe Konten :
Tipe Media :
Tipe Carrier :
Deskripsi Fisik : xii, 147 hlm. : ill. ; 28 cm. + lamp.
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T24379 15-20-123311931 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 116275
Cover