Analisis perencanaan pengembangan sistem pembangkitan tenaga listrik pulau Bintan = Expansion plan analisys of bintan island electricity generation system

Simangunsong, Sahat; Iwa Garniwa M.K., supervisor (Fakultas Teknik Universitas Indonesia, 2009)

 Abstrak

Pada tahun 2006, Sistem Tanjung Pinang dan Sistem Tanjung Uban, dua sistem ketenagalistrikan di Pulau Bintan dinyatakan dalam kondisi krisis pasokan tenaga listrik. Akan tetapi, pasca penetapan kondisi krisis tersebut, kedua sistem belum keluar dari kondisi krisis dan butuh penanganan yang mendesak. Tulisan ini membahas perencanaan pengembangan sistem pembangkitan di Pulau Bintan termasuk menganalisis rencana interkoneksi ke Sistem Batam. Dari hasil analisis diperoleh bahwa interkoneksi Batam-Bintan tidak efisien diimplementasikan, karena biaya pembangkitan menjadi sangat tinggi. Jika Sistem Tanjung Uban stand alone, pengembangan pembangkitan yang handal hanya dapat dilakukan dengan pembangunan PLTD dalam jumlah banyak, sehingga tidak efisien. Sementara jika Sistem Tanjung Uban dan Sistem Tanjung Pinang terinterkoneksi, pada tingkat kehandalan yang sama (LOLP < 1 hari pada tahun 2020), diperoleh potensi penghematan sekitar USD25.3 juta hingga tahun 2020 atau rata-rata USD2.3 juta/tahun dibandingkan dengan jika kedua sistem stand alone. Dengan demikian pilihan terbaik dalam pengembangan sistem pembangkitan di Pulau Bintan adalah membangun Sistem Bintan Interkoneksi disertai pembangunan sejumlah pembangkit hingga tahun 2020 yang terdiri dari 16 unit PLTU Batubara dengan total kapasitas 120 MW, 3 unit PLTD dengan total kapasitas 15 MW dan 12 unit PLTG dengan total kapasitas 75 MW.

In 2006, Tanjung Pinang and Tanjung Uban electricity systems located in Bintan Island, were stipulated as area in electricity crisis condition. But since the stipulation untill today, both of the system remain in crisis, and need an immediate solution. This thesis studies on the ekspansion plan of generating system in Bintan, including studies on an alternative power source, that is Batam-Bintan interconnection. Analysis? result shows that Batam-Bintan interconnection is not feasible to be implemented, since it can rise up generation cost. If Tanjung Uban remains stand alone, a reliable generation system could only be achieved by developing a huge number of oil power plants, therefore will be ineficient. Meanwhile if Tanjung Uban and Tanjung Pinang are interconnected, at the same reability level (<1 day in 2020), there was a chance to get efficiency from interconnection option around USD25.3 Milion until 2020, or averagely USD2.3 Million/year compared to stand alone option. Therefore the best choice to expand generation system in Bintan is connecting both of the system by a transmission line, with a number of generation additions untill 2020 consist of 16 units coal fire power plant (PP) with total capacity 120 MW, 3 units oil PP (total capacity 15 MW) and 12 units gas turbin PP (total capacity 75 MW).

 Metadata

Jenis Koleksi : UI - Tesis Open
No. Panggil : T 26019
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2009
Bahasa : ind
Sumber Pengatalogan :
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xii, 125 pages : illustration ; 29 cm
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T 26019 15-17-401358061 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 122210
Cover