Peningkatan kinerja daya saing tenaga kerja konstruksi pekerjaan jalan = The competitive performance improvement of the road construction worker

Suntana Sukma Djatnika; Budi Susilo Soepandji, supervisor; Ismeth Abidin, supervisor (Fakultas Teknik Universitas Indonesia, 2008)

 Abstrak

Berdasarkan prioritas pembangunan nasional ke depan, Pemerintah bersama sektor swasta akan membangun proyek-proyek konstruksi infrastruktur jalan berskala besar. Globalisasi membuat pasar konstruksi lokal terbuka bagi perusahaan dan tenaga kerja asing. Sektor konstruksi di Indonesia sekarang ini masih menghadapi banyak masalah, antara lain kinerja daya saing tenaga kerja pekerjaan jalan. Secara umum kinerja daya saing dan kompetensi tenaga kerja pekerjaan jalan masih rendah jika dibandingkan dengan tenaga kerja asing. Kinerja tenaga kerja ini meliputi efektifitas, efisiensi, kualitas hasil kerja, ketepatan waktu, produktifitas dan keselamatan kerja. Apabila tidak dilakukan upaya peningkatan kinerja daya saing tersebut, di waktu mendatang pasar konstruksi dan tenaga kerja pekerjaan jalan berskala internasional di dalam negeridapat didominasi oleh pihak asing.
Tujuan penelitian adalah meningkatkan kinerja daya saing tenaga kerja pekerjaan jalan dengan cara mengidentifikasi faktor yang mempengaruhi rendahnya kinerja daya saing, mengidentifikasi faktor penyebab dan dampak rendahnya kinerja daya saing dan melakukan analisis untuk merekomendasikan bagaimana meningkatkan kinerja daya saing tenaga kerja konstruksi pekerjaan jalan. Penelitian ini dibatasi pada proyek jalan berskala besar.
Jika peningkatan semua faktor kinerja dilakukan secara maksimal, berdasarkan hasil perhitungan simulasi teoritis tentang optimalisasi output pekerjaan jalan dapat diperoleh kisaran biaya langsung tenaga kerja bobot biaya tenaga kerja berada pada batas 6,52% - 11% dari total biaya langsung, bobot biaya material pada batas 44,60 % sampai 62,70 %, bobot biaya peralatan pada batas 19,58 % sampai 21,18 %, bobot biaya sub kontraktor pada batas 16,63 % sampai 30,48 %, dan bobot biaya overhead lapangan pada batas 4,50 % sampai 5,78%.
Peningkatan kinerja daya saing tenaga kerja pekerjaan jalan akan memberikan manfaat pencapaian efisiensi kerja, pelaksanaan pekerjaan yang lebih efektif, produktifitas lebih tinggi, waktu kerja sesuai dengan jadwal waktu pelaksanaan, mutu pekerjaan sesuai perencanaan dan tercapainya keselamatan kerja. Peningkatan kinerja daya saing ini akan membuat tenaga kerja pekerjaan jalan lebih siap dalam menghadapi globalisasi.

Based on the coming national development plan priority, Government and private sector will develop many large scale road constructions infrastructure projects. Globalization will make the domestic market opens to foreign construction companies and workers. Construction sector in Indonesia is still facing many problems; one of them is the construction worker competitive performance. In general the road worker competitive performance and competency are lower compare to foreign workers. The determinant factors of the worker competitive performance are effectiveness, efficiency, quality, timeliness, productivity and safety. Without any improvement of this situation in the coming future, the local construction market and the role of construction workers may be dominated by foreigners.
The objective of this research is to increase the road construction worker competitive performance, consist of the identification of the influencing factors, the identification the cause and impact of low competitive performance and analyzing the recommendation of improving the road worker competitive performance. This research was limited to large scale road construction project. If all road construction worker competitive performance factors are being maximally improved, by theoretical simulation computation of the optimal road work output, the road construction worker direct cost range is between 6,52% to 11% from the direct cost, the material cost range is between 44,60 % to 62,70 %, the equipment cost range is between 19,58 % to 21,18 %, the sub contractor cost range is between 16,63 % to 30,48 %, and the project overhead cost range is between 4,50 % to 5,78 %.
The benefit of the road construction worker competitive performances improvement are working efficiency achievement, more effective works, higher productivity, timeliness according to the work time schedule, obtaining quality of works and work safety. This performance improvement will make the road construction worker more ready to face the global competition.

 File Digital: 10

Shelf
 D 00925 Peningkatan kinerja--Lampiran.pdf :: Unduh
 D 00925 Peningkatan kinerja--Analisis.pdf :: Unduh
 D 00925 Peningkatan kinerja.pdf :: Unduh
 D 00925 Peningkatan kinerja-- HA.pdf :: Unduh
 D 00925 Peningkatan kinerja--Literatur.pdf :: Unduh
 D 00925 Peningkatan kinerja--Kesimpulan.pdf :: Unduh
 D 00925 Peningkatan kinerja---Abstrak.pdf :: Unduh
 D 00925 Peningkatan kinerja--Metodologi.pdf :: Unduh
 D 00925 Peningkatan kinerja--Pendahuluan.pdf :: Unduh
 D 00925 Peningkatan kinerja--Bibliografi.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Disertasi Membership
No. Panggil : D925
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2008
Bahasa : ind
Sumber Pengatalogan :
Tipe Konten :
Tipe Media :
Tipe Carrier :
Deskripsi Fisik : xxiii, 259 hlm., il., 29 cm.
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 4
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
D925 07-21-822498561 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 129831
Cover