UI - Tesis Open :: Back

UI - Tesis Open :: Back

Identifikasi faktor-faktor risiko underestimate cost dan overestimate cost tahap lelang yang disebabkan kompetensi cost engineer yang berpengaruh terhadap kinerja tim tender pada perusahaan jasa konstruksi = Identification of risk factors on underestimate cost and overestimate cost caused by cost engineer competences at the bidding stage to the tender team performance in the construction company

Sugeng Riyanta; Yusuf Latief, supervisor; Eddy Subiyanto, supervisor; Krisna Mochtar, examiner; Mohammed Ali Berawi, examiner; Ayomi Dita Rarasati, examiner (Fakultas Teknik Universitas Indonesia, 2010)

 Abstract

Proses kegiatan estimasi tahap lelang merupakan hal yang kritis bagi cost engineer dalam memperkirakan biaya proyek. Kemungkinan terjadinya kesalahan-kesalahan dalam proses estimasi biaya tersebut sangat besar, sehingga mengakibatkan estimasi biaya proyek tidak realitis dan tidak akurat (kemungkinan dapat terjadi underestimate cost atau overestimate cost). Penilitian ini bertujuan untuk mengidentifikasi faktor risiko yang dominan yang dapat mempengaruhi tingkat akurasi estimasi biaya proyek tahap lelang yang disebabkan kompetensi cost engineer. Penelitian ini menggunakan metode survey. Hasil penelitian menunjukkan bahwa faktor risiko yang dominan adalah penggunaan database dan informasi yang buruk, kelemahan dalam pemilihan metode kerja, kesulitan mendapatkan harga subkontraktor spesialis.

Estimation process in bidding stage is critical for the cost engineer to predict the project costs. It's a big possibility to have errors in estimating the expanses that causes unrealistic and inaccurate estimation project cost (underestimate cost or overestimate cost could possibly happen). This research is aimed to identify the dominant factor that can influence accuracy level in determining estimation project cost because of cost engineer competences. Survey method is used for this research. The result shows that the using of terrible information database is the most dominant factor of errors. while other things like bad construction method, difficulties in getting specialist subcontractor price come after it.

 Metadata

Collection Type : UI - Tesis Open
Call Number : T27787
Main entry-Personal name :
Additional entry-Personal name :
Additional entry-Corporate name :
Study Program :
Subject :
Publishing : Depok: Fakultas Teknik Universitas Indonesia, 2010
Cataloguing Source LibUI ind rda
Content Type text
Media Type unmediated ; computer
Carrier Type volume ; online resource
Physical Description xvi, 282 pages : illustration ; 30 cm. + Appendix
Holding Institution Universitas Indonesia
Location Perpustakaan UI, Lantai 3
  • Availability
  • Review
  • Cover
Call Number Barcode Number Availability
T27787 15-19-524250467 TERSEDIA
Review:
No review available for this collection: 132927
Cover