Identifikasi potensi penghematan biaya kegiatan pekerjaan mekanikal/elektrikal pada proyek konstruksi bangunan gedung perkantoran = Identifying the potential saving cost of mechanical/electrical work activities at the officeblock buildings construction project

Zulfikar; Yusuf Latief, supervisor; El Khobar Muhaemin Nazech, examiner (Fakultas Teknik Universitas Indonesia, 2006)

 Abstrak

Pemborosan merupakan istilah yang tidak diinginkan pada bidang industri konstruksi. Karena keterbatasan waktu dan informasi yang merupakan kendala pada tahap disain maka sering timbul biaya yang tidak berperan dalam proyek konstruksi. Value Engineering (VE) adalah satu teknik manajemen, yang membantu menemukan biaya-biaya yang tidak berperan dalam fungsi atau kebutuhan pencapaian proyek.
Value Engineering bukan sebagai cost reduction / cutting cost yaitu mengurangi biaya dengan mengurangi mutu dan sebagai konsekuensi mengurangi nilai produk. Pekerjaan mekanikal dan elektrikal dalam proyek gedung perkantoran bertingkat memiliki anggaran sekitar sepertiga dari biaya konstruksi. Hal tersebut memiliki potensi penghematan yang cukup besar tanpa menghilangkan fungsi dasar yang ada.
Penulis menganalisa pekerjaan mekanikal dan elektrikal pada proyek gedung perkantoran. Dengan teknik-teknik value engineering dapat mengidentifikasi kegiatan pekerjaan mekanikal dan elektrikal yang dapat dihemat pada proyek gedung perkantoran dan menetapkan bahwa pekerjaan listrik, tata udara dan sistem pemadam kebakaran yang berpotensi untuk dilakukan penghematan.

Overrun is one of the most detested terms in the construction industry. Because paucity of time and information is constraint at stage of design often get showed unnecessary costs in construction project. Value Engineering (VE) is one such management technique, which helps find out costs that do not contribute to the function or performance requirements of the project.
Value Engineering is not cost reduction / cost cutting is reduce cost by reduces the quality and consequently reduces the value of product. Mechanical and electrical work in the high rise building construction project has budgets around a third from cost construction. The mentioned have big saving cost potency without eliminating basic function.
Writer analyse mechanical and electrical work activity at the officebl_Ck project. With value engineering techniques can identify a mechanical and electrical work activity able to be economized at the officebl_Ck project and contend that electrical work, air conditioning system and fire fighting system is have potency to be conducted by saving.

 File Digital: 1

Shelf
 S35842-Zulfikar.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Skripsi Membership
No. Panggil : S35842
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Program Studi :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2006
Bahasa : ind
Sumber Pengatalogan :
Tipe Konten :
Tipe Media :
Tipe Carrier :
Deskripsi Fisik : xiii, 83 hlm. : ill. ; 30 cm. + lamp.
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
S35842 14-21-02418766 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20239748
Cover