Analisa biaya dan aktivitas proyek pada PT CGE dengan metode activity based costing

Erik W Gotara; Betrianis, supervisor (Fakultas Teknik Universitas Indonesia, 2005)

 Abstrak

Persaingan bisnis semakin ketal dan turbulen baik didalam negeri maupun secara globaL Hal ini memaksa perusahaan untuk Uerkompetisi dalam hal kualitas, waktu dan harga. Ketiga ha! tersebut men1pakan faktor penting bagi kehmgsungan hidup sebuah perusahaan. Untuk itu pemsahaan harus memperhaiikan biaya yang mendukung segala aktivitas dalam perusahaan. Sistem ABC (Aclivify Based Costing) membcrikan suatu perhiumgan biaya dari setiap aktivitas dan membebankannya kepada objek biaya berdasarkan alokasi aktivitas attHJ pemicu aktivitas. PT. CGE merupakan pcrusnbaan kontraktor rekayasa (eugmeering) yang sifatnya sebagai perusahnan jasa, dimana pekerjaan yang dilakukan bcrsifut job order. PT. CGE mendapnt kesulitan dalam menentukan harga jual jasa dan mengalokasikan biaya tidak langsung proyek terhadap masing - masing proyek yang telah dikerjakan dalam satu bulan. Sehingga dapat diketnhui secara akurat keuntungan a tau kerogian yang dipero1eh dalarn sam bulan. Untuk itu penulis rnelakukan penelitian dengan melakukan analisa biaya dan aktivitas berdasarkan metode ABC. Dcngan metode ini penulis dapat meHentukan biaya dari setiap aktivitas yang terjadL menentukan rare perkiraan biuya tidak langsung yang d\tentukrm dimuka, dan a!okasi biaya yang terjadl tcrhadap masingmasing proyck. Berdasarkan analisa biaya aktivltas, kfta dapat mcnbnatknn umtan prioritas pcrbaikan untuk setiap .aktivita!\ di pcrusahaan. Anali:;a binya prny~¢k mGnghasiikan persentase bcsamya konsumsi biaya dari masing - masing proyck. Mcmberikan informasi umung ntgi yang lebih ~kurat. Sedangknn nnalisis distorsi biaya memberikan infomn1si tetllang perbcdaan konsumsi biaya tidak !angsung proyek yang berdasarkan ta.rif yang ditentukrm dimuka dengan hiaya yang sesungguhnya tctjadi. Kemudian dengan sistem Actil·iry Based 1'~

The fierce global competition and turbulence even domc:stic LO abroad. This reason make the company be more competitive for lheir product time and prices. These three reasons is very important for the company life. So that the company must concern costs that support the activities in company. ABC system give the calculation cost of individual activities and assign cost to cost object based on activity driver. PT. CGE is engineering comroctor company such as Service Company which does the project based on job order. PT CGE has problems to point the sales prices for their services and the allocation of indirect cost to each of activity project that have done for I (one) month. The writer do the research by doing cost analyzes and activity based on ABC method. This method make the writer settle each activilies cost that was done, definite predetermined indirect ac!ivity cost rate, and allocation cost that use for each of projects. Based on analyzer activity cost, we can make prioriry grade recurring for each activity in company. Project cost analyses produce percentage of cost consumption for each project Give the information abnut calculation of benefit and loss cost. Analysis of cost distortion give the information about dif!Crences of indirect cost ccnsuli1ption base predelermined ar.:livit)' driver cost with the real indirect cost happened. Then Activity based management system give some impommt decision such as selection for value added activities and non value added activities. Management can manage nctivlty by selection. reducing. and share of activittes and then analyze the changmg. of systern that was made.

 File Digital: 1

Shelf
 S50096-Erik W Gotara.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Skripsi Membership
No. Panggil : S50096
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2005
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xiv, 79 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
S50096 14-23-03184178 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20248121
Cover