Pengaruh manajemen material terhadap produktivitas kerja proyek kontruksi gedung bertingkat pada pekerjaan struktur (Studi kasus: Proyek X ) = The influence of material management on productivity performance in structure work of highrise building construction project (Case study: Project X)

Anggi Widiarso; Setyo Supriyadi, supervisor; Asiyanto, examiner; Mohammed Ali Berawi, examiner; Ayomi Dita Rarasati, examiner (Fakultas Teknik Universitas Indonesia, 2010)

 Abstrak

Produktivitas sudah menjadi suatu ukuan dalam mempertimbangkan apakah suatu proyek dilaksanakan secara efektif atau tidak. Produktivitas kerja suatu proyek rendah maka akan menimbulkan dampak berupa keterlambatan proyek sehingga proyek terlambat dan terjadi penyimpangan biaya akhir proyek. Salah satu faktor yang mempengaruhi produktivitas kerja dalam proyek konstruksi adalah manajemen material. Terlebih lagi, material merupakan sumber daya yang paling besar persentase biayanya dari keseluruhan biaya proyek. Pada proyek konstruksi biaya material dan peralatan nilainya bisa mencapai 50-60% dari total biaya proyek.
Penelitian ini merupakan penelitian studi kasus dan survey dengan mencari keterkaitan produktivitas kerja proyek X dengan kinerja manajemen material dalam proyek tersebut. Hasil penelitian didapatkan faktor-faktor dominan dalam manajemen material yang mempengaruhi produktivitas kerja proyek dan strategi pengendaliannya. Faktor-faktor dominan yang didapat yakni X33 (letak penyimpanan material di area kerja) dan X 38 (Pemahaman karakteristik lokasi pekerjaan) dengan model regresi Y = -0,640 + 0,485 X38 + 0,286 X33.

Productivity has become a criterion in considering whether a project is carried out effectively or not. If the productivity is low, it will result delays in the project that can effect on delay of the projects and that cause deviates from the final cost of the project. One of the factors affecting productivity in construction projects is material management. Moreover, the material is the greatest resource cost of the overall percentage of project cost. On construction projects worth the cost of materials and equipment can reach 50-60% of the total project cost.
This research is a case study and survey by looking for project-X work productivity with performance of material management in the project. The results showed that the dominant factors in the management of materials are affecting work productivity and project control strategies. Dominant factors obtained namely X33 (material storage location in the work area) and X 38 (Understanding the characteristics of the location of work) with the regression model Y = -0.640 + 0.485 X38 + 0.286 X33.

 File Digital: 1

 Metadata

Jenis Koleksi : UI - Skripsi Open
No. Panggil : S50655
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Program Studi :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2010
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xviii, 132 pages : illustration ; 30 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3