UI - Skripsi Open :: Back

UI - Skripsi Open :: Back

Analisis faktor risiko dominan yang mempengaruhi biaya contingancy pada proyek pembangunan/peningkatan jalan tol Jakarta - Cikampek. (Studi kasus: Ruas Cibitung Cikarang Timur Km 24 + 200 - Km 37 + 900) = Analysis dominant risk factors affecting contingency cost estimation of construction project implementation of Jakarta-Cikampek highway improvement. (Case studies: Cibitung Cikarang Timur Km 24+200 ? Km 37 + 900)

Mohammad Al Fatih; Yusuf Latief, supervisor; Sihombing, Lukas Beladi, examiner; Ismeth Abidin, examiner; Mohammed Ali Berawi, foreword; Ayomi Dita Rarasati, examiner ([Publisher not identified] , 2010)

 Abstract

ABSTRAK
Penelitian dilakukan pada ruas Cibitung-Cikarang Timur yang termasuk kedalam proyek konstruksi peningkatan Jalan tol Jakarta-Cikampek. Terdapat faktor risiko konstruksi pada perencanaan dan pelaksanaannya. Tujuan penelitian ialah mengidentifikasi dan menganalisis risiko dominan yang terjadi didalam proyek yang dapat diatasi oleh biaya contingency yang tepat dengan berbasis risk management PMBOK 2008. Pengolahan data penelitian ini dengan SPSS V17 untuk mengidentifikasi risiko dominan mendapatkan model matematika. Dari persamaan model matematika diketahui terdapat hubungan linier antara Tingkat Penguasaan Risiko Dominan dengan Penetapan Besaran Contingency, dimana semakin tinggi Penguasaan Risiko maka Besaran Contingency semakin rendah. Pernyataan ini membuktikan kebenaran dari hipotesis yang telah dikemukakan sebelumnya.

ABSTRACT
The research was implemented in the streets Cikarang Cibitung East which was included into construction projects implementation of Jakarta-Cikampek highway improvement. There were a number of risk factor construction in the planning and executing. The purpose of this research was to a identify and analyzed the dominant risk occurred in the project that it could be overcome by propered a contingency fee-based risk management with the PMBOK 2008. Data was processed by SPSS V17 to got identify the dominant risk and mathematical relation model. From the mathematical model equations was known linear relationship between Mastery Level of Risk Dominance with Contingency costing, where the higher the mastery of risk then made lower the contingency costing. This statement proved the truth of the hypothesis was expressed at early.

 Digital Files: 1

 Metadata

Collection Type : UI - Skripsi Open
Call Number : S50588
Main entry-Personal name :
Additional entry-Personal name :
Additional entry-Corporate name :
Study Program :
Publishing : [Place of publication not identified]: [Publisher not identified], 2010
Cataloguing Source LibUI ind rda
Content Type text
Media Type unmediated ; computer
Carrier Type volume ; online resource
Physical Description xvii, 162 pages : illustration ; 30 cm + appendix
Concise Text
Holding Institution Universitas Indonesia
Location Perpustakaan UI, Lantai 3
  • Availability
  • Review
  • Cover
Call Number Barcode Number Availability
S50588 14-17-487905692 TERSEDIA
Review:
No review available for this collection: 20248565
Cover