UI - Skripsi Open :: Kembali

UI - Skripsi Open :: Kembali

Analisis bisnis proses manajemen untuk meningkatkan kualitas manajemen proyek pada material tower industri penyedia infrastruktur telekomunikasi = Analysis of business process management to increase management project quality of tower material in telecommunication infrastructure provider industry

Yovi Efidori; M. Dachyar, supervisor (Fakultas Teknik Universitas Indonesia, 2008)

 Abstrak

Permintaan akan menara pada Industri Telekomunikasi mengharuskan perusahaan penyedia penyewaan menara mengaplikasikan ilmu manajemen proyek dalam melakukan pembangunan menara yang baru dimana proses yang dibutuhkan selain rumit juga terdiri dari ratusan atau ribuan proses. Dengan pengaplikasian ilmu manajemen proyek maka perencanaan yang dilakukan dalam pembuatan menara menjadi lebih rapi dan detil sehingga jadwal pelaksanaan proyek menjadi sesuai dengan perencanaan proyek maka keterlambatan dalam waktu penyelesaian proyek dapat dihindari.
Untuk memenuhi kualitas proyek pembangunan menara maka diperlukan suatu manajemen kualitas proyek dan bisnis proses yang baik agar pembangunan menara bisa mencapai waktu pembangunan yang diinginkan, sehingga dapat memberikan kepuasan kepada pelanggan seperti yang diharapkan, data yang di dapat anatara lain adalah data mengenai lokasi yang memiliki kekurangan material ukuran kecil maupun besar, kurang lubang, kualitas material galvanis yang buruk, spesifikasi vendor, pemesanan material, dan kapasitas produksi vendor.
Kesimpulannya adalah ketidak presisian material tower dan kurang lubang adalah karena 57% vendor masih melakukan pabrikasi secara manual, dan vendor menggunakan karung goni pada saat packaging material tower kecil, serta overload dari vendor yang mengakibatkan lamanya produksi material tower.

The demands of towers in Telecommunication Industry recently require a tower provider company to apply Project Management on their next project which process is going to be complicated and contains hundreds or thousands processes. With the implementation of project management, the process in erecting tower can be well-planned so the project schedule appropriate with the project plan and the delay of time in finishing a project can be avoided.
To fulfill the quality of tower erecting project, it requires a wellknowledged of project quality management and business process to reach the time that we wish to achieve customer satisfaction. The focus in this study includes some data such as: some locations that have a lack of amount in materials both in small size and big size, lack of hole, terrible galvanish quality material, vendor specification, material order, and vendor capacity production.
The conclusion is the unprecision of tower material and the lack of hole is because 57% of vendors still do the manufacturing manually, and vendors use gunny sack in packaging for the smaller material of tower, and they are also overload so that cause the production of tower material need more lenght of time.

 File Digital: 1

 Metadata

Jenis Koleksi : UI - Skripsi Open
No. Panggil : S51909
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Program Studi :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2008
Bahasa : ind
Sumber Pengatalogan :
Tipe Konten :
Tipe Media :
Tipe Carrier :
Deskripsi Fisik : xii, 87 hlm. : ilus. ; 30 cm. + lamp.
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
S51909 14-22-80473797 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20250170
Cover