Analisa faktor - faktor yang mempengaruhi dalam mengestmasi harga TUG Boat 2x867 HP = Analysis of influenced factors in cost estimating of tug boat 2 X 867 HP

Ahadiat Zulfajriansyah Lamid; Talahatu, Marcus Alberth, supervisor (Fakultas Teknik Universitas Indonesia, 2009)

 Abstrak

Dalam bisnis perkapalan, galangan kapal harus bisa memperkirakan harga kapal secara akurat. Perkiraan harga diperlukan dalam proses penawaran, perubahan pesanan, dan studi penjualan. Banyak pendekatan perkiraan harga yang ada, berdasarkan pada perhitungan dari kapal-kapal yang dibangun sebelumnya, parameter secara keseluruhan, dan analisa fisika. Perkiraan harga merupakan hal yang cukup sulit di dunia perkapalan. Estimator harga bisa saja kekurangan informasi teknis aktual dan mendapat data yang tidak konsisten.
Insinyur perkapalan dan arsitek kapal kebanyakan kekurangan umpan balik dalam konsekwensi harga dari pilihan teknis mereka. Manager sering kekurangan informasi ditandai dari tingkat kepercayaan diri mereka dalam memperkirakan harga dalam pilihan bisnis. Akhirnya, banyak pendekatan dalam memperkirakan harga misterius dan tidak disahkan secara formal (setiap estimator harga mempunyai buku pegangan mereka masing-masing), menyulitkan (memerlukan waktu yang terlalu lama untuk digunakan oleh pembuat pilihan), atau sulit untuk digunakan (kurva yang curam).
Tujuan penulisan tugas akhir ini adalah untuk menyediakan pendekatan yang sederhana, yang memudahkan untuk insinyur perkapalan, arsitek kapal dan estimator harga dalam memperkirakan harga kapal. Pendekatan dibuat ini berdasarkan pengamatan dan analisa dari data-data yang didapatkan dari berbagai sumber.

In shipping business, shipyards must be able to accurately estimate costs. Cost estimating is necessary for the bid process, for change orders, and for tradeoff studies. Numerous cost estimating approaches exist. They are based on extrapolations from previously-built ships, detailed bottoms-up parametrics, and integrated physics-based analyses. Cost estimating can be frustrating to shipyard personnel. Cost estimators may lack timely technical information and face data inconsistencies.
Ship engineers and naval architects commonly lack feed-back on the cost consequences of their technical decisions. Managers often lack information denoting the level of confidence in cost estimates upon which they must make business decisions. Finally, many approaches to cost estimating are mysterious and not formally validated (each cost estimator has his own black book), complicated (too time consuming to be of use to decision makers), or difficult to use (steep learning curve).
This paper presents an approach that is simple, yet enables instant sharing of cost and technical data among ship engineers, naval architects and cost estimators; gives confidence measures to managers; and is user friendly. The approach is based on several years' development work in support of shipyard engineers, naval architects, and cost estimators.

 Metadata

Jenis Koleksi : UI - Skripsi Open
No. Panggil : S51016
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2009
Bahasa : ind
Sumber Pengatalogan :
Tipe Konten :
Tipe Media :
Tipe Carrier :
Deskripsi Fisik : xvi, 61 hlm. : ill. ; 28 cm. + lamp.
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
S51016 14-20-409419778 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20250361
Cover