UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Identifikasi risiko investor dalam investasi jalan tol

Dalijus, Beta Proton; Bambang Trigunarsyah, supervisor; Rudy Hermawan Karsaman, examiner (Fakultas Teknik Universitas Indonesia, 2007)

 Abstrak

Dengan dicanangkannya percepatan pembangunan infrastruktur yang antara lain juga mencakup pembangunan 1600 km jalan tol dalam 5 (lima) tahun kedepan, pemerintah sudah melakukan perombakan pada regulasi yang mempermudah untuk berinvestasi bisnis jalan tol yang bankable dengan ditetapkannya Undang-Undang No. 38 tahun 2004 tentang Jalan dan Peraturan Pemerintah No. 15 tahun 2005 tentang Jalan Tol. Konsep yang mendasari jalan tol adalah suatu konsep pendanaan dimana dana pembangunan jalan tol sepenuhnya diperoleh dari pemakai jalan tol melalui pengenaan tarif tol. Sedangkan investor dibantu lembaga-lembaga pendanaan dalam hal ini berfungsi sebagai ""jembatan"" agar jalan tol yang bersangkutan dapat diwujudkan dan menghasilkan pendapatan. Industri jalan tol merupakan proyek yang sangat dipengaruhi risiko dan ketidakpastian dimana timbulnya risiko dan ketidakpastian akan mempengaruhi investor merencanakan investasi proyek jalan tol.
Penelitian ini dilakukan untuk mendapatkan identifikasi risiko yang mempengaruhi perencanaan pengelolaan risiko (risk response planning) investor jalan tol dalam berinvestasi jalan tol. Untuk mencapai tujuan penelitian dilakukan studi kasus pada investor jalan tol antara lain ; PT. Jasa Marga (Persero), PT. Bangun Tjipta Sarana, PT. Kresna Kusuma Dyandra Marga, dan konsultan jalan tol yaitu, PT. Perentjana Djaya. Dan untuk mendapatkan prioritas urutan identifikasi risiko menggunakan metode analisa data Analytic Hierarchy Process (AHP) dengan bantuan software Expert Choice dan SPSS versi 13.
Setelah melakukan pengujian data dan pasing grade derajat signifikan > 0.050 menurut output Expert Choice, maka didapat hasil bahwa faktor internal lebih dominan dari pada faktor eksternal, dimana prioritas berdasarkan kriteria yaitu identifikasi risiko dan risk attitude memberikan kontribusi hasil yang signifikan. Sedangkan urutan prioritas identifikasi risiko berdasarkan subkriteria adalah; variabel penentuan besaran tarif, perkiraan biaya konstruksi, operasi, dan pemeliharaan, perkiraan volume lalu lintas, tingkat pengembalian investasi, masa konsesi, kematangan dalam mengambil keputusan, profesionalitas sikap, dan keterlambatan penyelesaian proyek.

By proclaiming of acceleration of infrastructure reconstruction that includes development 1600 km toll road in the following five years, the government has made radical changes in regulation which is to get easier in bankable toll road business investment that settled by the Ordinance no.38/2004 that is about road and the Governmental Regulation No.15/2005 that is about toll road. The best concept of toll road is funding concept which all fund completely taken from the toll road consumers through the toll fare imposition. Whereas, the investor is helped by funding organizations, that has function as "the bridge", so that the toll road project can be appreciated and get income.
This project has been a project that's very affected by risk and uncertainty that will touch the investor to give an account of toll road investment. This research is conducted to get to know which risk identification that's influenced the risk response planning, for the investor in toll road investment. For that, a case study has been made to three local toll road investors : PT. Jasa Marga (Persero), PT. Bangun Tjipta Sarana, PT. Kresna Kusuma Dyandra Marga, and one toll road consultant named PT. Perentjana Djaya. And to get the priority risk factor, all data are done by Analytic Hierarchy Process (AHP) method, Expert Choice software and SPSS version 13.
After analyzing all datas and passing grade significant degree > 0.050, and also according to the expert choice output, this research determines that internal factors are more dominant than the external ones, that the factor priority based on the criteria is risk identifying and risk attitude give a significant contribution result. Whereas, a sequence of factor based on sub-criteria is (in order rank) variable of fare determination, estimation of construction, operation, and maintenance cost, estimation of traffic volume, restitution level of investment, concession period, well done in decision making, professional behave, and project finishing delay.

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T40743
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Program Studi :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2007
Bahasa : ind
Sumber Pengatalogan :
Tipe Konten :
Tipe Media :
Tipe Carrier :
Deskripsi Fisik : vii, 82 hlm. : ilus. ; 30 cm. + lamp.
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T40743 15-21-99852206 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20274009
Cover