UI - Tesis Open :: Kembali

UI - Tesis Open :: Kembali

Perancangan manajemen kinerja pada manajemen proyek konstruksi pembangunan line produksi baru dengan metode balanced scorecard = Balanced scorecard application as a method of performance management of project management on new production line construction

Wahyu Hidayati; Sri Bintang Pamungkas, 1945-, supervisor; M. Dachyar, supervisor (Fakultas Teknik Universitas Indonesia, 2010)

 Abstrak

PT X menyelenggarakan proyek pembangunan line baru setiap tahun sebagai upaya untuk pengembangan bisnis secara bertahap. Hal ini berkaitan juga dengan pertumbuhan pasar yang ditandai dengan permintaan produk yang terus bertambah. Harapan dari proyek - proyek tersebut adalah menghasilkan line produksi yang dapat dioperasikan tepat waktu atau lebih cepat dan menghasilkan produktivitas tinggi, misalnya melalui proses produksinya yang efisien. Kondisi proyek - proyek yang telah berlangsung mengalami beberapa kendala klasik seperti keterlambatan, biaya yang berlebih dan kemudian saat line produksi dijalankan tidak beroperasi dengen efisien. Oleh karena itu dalam penelitian ini akan dirancang suatu metode pemetaan strategi dengan balance scorecard untuk mengerahkan pengelolaan proyek agar dapat mencapai kinerja pada tingkatan yang diharapkan. Balanced scorecard tidak semata bertujuan untuk menilai seberapa baik atau seberapa buruk jalannya suatu proyek tetapi mengarahkan seluruh elemen untuk bisa fokus terhadap strategi yang telah dibuat. Yang mana strategi tersebut adalah upaya untuk mencapai kinerja terbaik. Disamping itu dengan metode tersebut akan dilakukan pengukuran sesuai key performance indicator yang dirancang untuk mengetahui tingkat pencapaian kinerja terhadap target yang telah ditentukan. hal ini akan menjadi dasar pada penentuan strategi - strategi berikutnya sebagai upaya perbaikan berkesinambungan.

PT X develop new production line construction project in almost in every year as a strategy of business expansion. It was related to market growth as an increasing trend of product demand. Objective of those project are to build a new production line that could operate on the expected time or faster than could create high productivity in efficient production process. On last project, there was classic problems like delay, over budget, than when the production line operated, there were not perform well. Therefore in this research would be designed a method of performance management with balance scorecard to force the project management to achieve on the desire level. Balanced scorecard not just objected to assess how well or how poor the project was rolled out, but to direct all element to keep focus on the strategy. That strategy is a path to achieve the best performance. With this method there would be some measurement with key performance indicators in which designed to monitor the achievement of performance to the defined target. It is a base line to formulate future strategy as a continual improvement programs.

 Metadata

Jenis Koleksi : UI - Tesis Open
No. Panggil : T41064
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2010
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated
Tipe Carrier : volume
Deskripsi Fisik : xiv, 64 pages : illustration ; 30 cm. + Appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T41064 15-19-153126879 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20274350
Cover