Analisis kepemilikan aset dan hutang proyek MRT Jakarta koridor selatan - utara (Lebak Bulus - Kampung Bandan) = Analysis of asset ownership and debt MRT Jakarta project in south corridor - northern (Lebak Bulus - Kampung Bandan)

(Fakultas Teknik Universitas Indonesia, 2011)

 Abstrak

Kemacetan lalu lintas di Kota Metropolitan Jakarta sudah sangat parah akibat pertumbuhan populasi yang tinggi, sebagai hasil dari pertumbuhan ekonomi dan arus populasi ke dalam propinsi di sekitar Jakarta yang kian besar. Untuk dapat mengatasi masalah kepadatan lalu lintas dan penurunan kualitas lingkungan ini, maka pengembangan sistem transportasi massal cepat (yang kemudian akan dinyatakan dengan proyek MRT) menjadi suatu kebutuhan yang mendesak bagi kota Jakarta dan juga Pemerintah Indonesia. Penelitian ini membahas tentang analisis kepemilikan aset dan hutang proyek Mass Rapid Transit Jakarta berdasarkan skenario finansial yang ada. Dimana proyek ini diperkirakan akan memulai fase konstruksi pada tahun 2012. Penelitian ini dilakukan dengan pengumpulan data-data finansial yang dibutuhkan, kemudian dihitung profit/loss structure dan cash flow yang kemudian akan dilakukan perhitungan untuk mencari rasio profitabilitas dan rasio likuiditas. Analisis finansial kepemilikan aset dan hutang dilakukan dengan berdasarkan rasio -rasio yang telah didapatkan. Hasil akhir dari penelitian ini bertujuan untuk melihat kekurangan dan kelebihan dari masing-masing skenario finansial yang ada, dimana keputusan diserahkan kepada pihak investor.

Abstract
Traffic congestion in metropolitan Jakarta is very severe due to high population growth, as a result of economic growth and population flows into the provinces around the greater Jakarta. To be able to overcome the problem of traffic congestion and environmental degradation, then the development of mass rapid transport system (which will then be expressed by the MRT project) to be an urgent need for the city of Jakarta and the Indonesian Government. This study discusses the analysis of asset ownership and debt Jakarta Mass Rapid Transit project is based on the existing financial scenario. Where the project is expected to begin the construction phase in 2012. The research was conducted by gathering financial data needed, and then calculated the profit / loss and cash flow structure which will then be carried out calculations to find the ratio of profitability and liquidity ratios. Financial analysis of asset ownership and debt carried by the basis of the ratio -a ratio that has been obtained. The end result of this study aims to look at advantages and disadvantages of each financial scenarios that exist, where decisions are handed over to the investor.

 File Digital: 1

 Metadata

Jenis Koleksi : UI - Skripsi Open
No. Panggil : S385
Program Studi :
Subjek :
Penerbitan : [Place of publication not identified]: Fakultas Teknik Universitas Indonesia, 2011
Bahasa : ind
Sumber Pengatalogan :
Tipe Konten :
Tipe Media :
Tipe Carrier :
Deskripsi Fisik : xvi, 86 hlm. : ill. ; 30 cm. + Lamp.
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
S385 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20279969
Cover