UI - Tesis Open :: Kembali

UI - Tesis Open :: Kembali

Analisis metode pendanaan Trustee Borrowing Scheme (TBS) : studi kasus pada Production Sharing Contract (PSC) X = Analysis of financing method trustee borrowing scheme (TBS) : a case study on production sharing contract (PSC) X

Lita Liana; Ancella Anitawati Hermawan, supervisor; Siregar, Sylvia Veronica Nalurita Purnama, examiner; Eko Rizkianto, examiner (Universitas Indonesia, 2011)

 Abstrak

Tesis ini menganalisis metode pendanaan kapal Floating LNG (FLNG) dengan membandingkan metode Trustee Borrowing Scheme (TBS) dan Skema production Sharing Contract (P,SC Scheme) pada PSC X. Metode penelitian yang dilakukan adalah studi kepustakaan dan observasi perusahaan melalui data internal dan eksternal perusahaan. Hasil analisis berdasarkan perhitungan keekonomian menyimpulkan bahwa proyek pembangunan kapal FLNG ini memberikan nilai tambah bagi perusahaan baik pada metode TBS maupun dengan skema PSC. Melalui metode TBS diperoleh tingkat pengembalian investasi yang lebih besar dibandingkan dengan skema PSC karena adanya faktor pembayarian biaya bunga yang dijadikan prioritas dalam cost recovery. Analisis sensitivitas memperlihatkan bahwa harga jual LNG yang mengacu kepada harga minyak merupakan variabel yang paling sensitif. Selain itu analisis juga dilakukan pada alternatif pendanaan dengan menggunakan skema leasing yang juga memberikan kontribusi yang tinggi bagi perusahaan namun perlu diperhatikan akan adanya peraturan mengenai kepemilikan aset yang tidak dapat dimiliki oleh pemerintah, besarnya tingkat pengembalian yang diharapkan perusahaan leasing serta kemampuan perusahaan leasing untuk mendanai proyek pembangunan FLNG.

This thesis analyzes financing methods of floating LNG (FLNG) by comparing the Trustee Borrowing Scheme (TBS) and Production Sharing Contract (PSC Scheme) in PSC X. The research method user literatur study and company's observation through internal and external data provided. The analysis results the development project of FLNG add value to the company both on TBS and PSC Scheme. The value of project in TBS is higher than PSC Scheme mainly due to interest cost and loan payment prioritization. In addition, sensitivity analysis shows that LNG sales price which index to oil price is the most sensitive variable. This thesis also analyzes an alternative financing method which is a lease scheme. The lease scheme gives higher contribution to the compony compare to TBS however the application of the scheme obstacled by the regulation that for asset leased it with not become the property of Government of Indonesia, IRR expected by the leasing company and also capability of leasing company in financing this FLNG project.

 File Digital: 1

 Metadata

Jenis Koleksi : UI - Tesis Open
No. Panggil : T30264
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Depok: Universitas Indonesia, 2011
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xiv, 93 pages : illustration ; 28 sm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T30264 15-18-204238058 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20298920
Cover