UI - Tesis Open :: Kembali

UI - Tesis Open :: Kembali

Analisis faktor penentu keberhasilan kerjasama pemerintah dan swasta pada pembangunan Terminal Peti Kemas Palaran = Critical success factor analysis of public private partnership in Palaran container terminal development project

Andria Dewi Shinta; Suyono Dikun, supervisor; Suwandi Saputro, supervisor; Sibarani, Mauritz M., examiner; Adi Hendriono, examiner; Iming Maknawan Tesalonika, examiner (Program Pascasarjana Universitas Indonesia, 2011)

 Abstrak

Kendala keterbatasan dana pemerintah dapat diselesaikan melalui skema kerjasama pemerintah dan swasta atau Public Private Partnerships (PPP). Terminal Peti Kemas Palaran adalah proyek yang dibangun dengan skema kerjasama pemerintah dan swasta. Penelitian ini bertujuan untuk mengidentifikasi faktor penentu keberhasilan (Critical Success Factor) pada proyek pembangunan dan pengoperasian Terminal Peti Kemas Palaran. Variabel faktor penentu keberhasilan dari hasil studi literatur diklasifikasikan dalam tahap perencanaan proyek, tahap penyiapan prastudi kelayakan proyek, tahap transaksi proyek, tahap build, tahap operate dan tahap transfer. Variabel tersebut kemudian divalidasi pakar dan dimasukkan ke dalam kuisioner untuk responden yang terkait. Data hasil kuisioner yang dikumpulkan menghasilkan suatu significance index (tingkat kepentingan) dan selanjutnya dianalisa dengan analisa faktor.
Hasil dari analisa faktor didapatkan untuk tahap perencanaan proyek, faktor komponen utama yang sangat berpengaruh yaitu faktor tersedianya data dan informasi (nilai keragaman 51%). Untuk tahap penyiapan prastudi kelayakan proyek, faktor komponen utama yang sangat berpengaruh yaitu faktor finansial (48%). Untuk tahap transaksi proyek, faktor komponen utama yang sangat berpengaruh yaitu faktor pengadaan barang dan jasa yang efektif (48%). Untuk tahap build, faktor komponen utama yang sangat berpengaruh yaitu faktor kondisi proyek (48%). Untuk tahap operate, faktor komponen utama yang sangat berpengaruh adalah faktor kondisi proyek (63%). Untuk tahap transfer, faktor komponen utama yang paling berpengaruh yaitu faktor kondisi proyek (55%).

The lack of funds from government to develop infrastructure can be solved by Public Private Partnerships (PPP) scheme. Palaran Container Terminal is a project that built using this scheme. The objectives of this research are to analyze Critical Success Factor (CSF) in public private partnerships in Palaran Container Terminal development project. CSF?s were taken from references and were classified into six phases, namely Project Planning, Preparation of Project Feasibility, Project Transaction, Build, Operate and Transfer. CSF?s were validated by the expert and filled by the respondents who get involved in this project. The analysis showed a significance index and then analyzes using factor analysis.
The analysis showed the CSF in those six phases. During the Project Planning, the most important factor is the availability of data and information (variance 51%). The most important factor in the Preparation of Project Feasibility is financial (48%). The most important factor in the Project Transaction is effective procurement (48%). While the most important factor for phases Build, Operate and Transfer is the condition of project with each variance is 48%, 63% and 55%.

 File Digital: 1

 Metadata

Jenis Koleksi : UI - Tesis Open
No. Panggil : T30345
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Program Studi :
Subjek :
Penerbitan : Jakarta: Program Pascasarjana Universitas Indonesia, 2011
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xiv, 224 pages : illustration ; 28 sm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T30345 15-18-056321601 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20300193
Cover