Implementasi audit kepabeanan oleh Direktorat Jenderal Bea dan Cukai atas impor material pembangkit energi listrik (Studi kasus PT PLN (Persero) Kantor Pusat) = Implementation of customs audit process by Direktorat Jenderal Bea dan Cukai for imports of power plants materials by PT. PLN (Persero)

Abie Rezanto; Inayati, supervisor; Ali Purwito Moesdradjad, examiner; Milla Sepliana Setyowati, examiner (Fakultas Ilmu Administrasi Universitas Indonesia, 2012)

 Abstrak

Audit kepabeanan bersifat post clearance yang bertujuan untuk menjaga kelancaran arus barang sekaligus mengetahui tingkat kepatuhan Wajib Pajak. Penghitungan bea masuk mengacu pada tarif yang digolongkan menurut Harmonized System. Dalam praktek audit kepabeanan terdapat kendala yakni perbedaan persepsi dalam pengklasifikasian HS Code yang berdampak pada perbedaan penghitungan bea masuk antara DJBC dan PLN dan ketidakjelasan dalam pemberian fasilitas pembebasan bea masuk serta sedikitnya tenggat waktu yang diberikan oleh DJBC untuk pengumpulan data audit. Penelitian ini adalah penelitian kualitatif deskriptif. Hasil penelitian menunjukkan bahwa dalam proses audit kepabeanan masih terdapat kendala-kendala dan ketidakjelasan yang diakibatkan kurangnya koordinasi antara PLN dengan DJBC.

Post clearance audit customs are aimed at keeping the flow of goods as well as knowing the level of compliance by Taxpayers. In calculating import duties customs audit refers to tarrifs which clasified according to the Harmonized System. In practice there is constraint which is the differences in perception of HS Code classification between PLN and DJBC that affects the calculation of import duties and resulting in obscurity in the granting of exemption of import duty facilities and also other barrier that occur is the short time limit given by DJBC for the collection of data supporting audit process. This research is a qualitative descriptive research. The results showed that in process of customs audit there are still constraints which resulting by the lack of coordination between PT. PLN and DJBC.

 File Digital: 1

 Metadata

Jenis Koleksi : UI - Skripsi Open
No. Panggil : S-Pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Ilmu Administrasi Universitas Indonesia, 2012
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resources
Deskripsi Fisik : xiii, 78 pages : illustration + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
S-Pdf 14-22-95517702 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20308327
Cover