UI - Tesis Open :: Kembali

UI - Tesis Open :: Kembali

Analisa Dampak Pembangunan Pembangkit Listrik 10.000 MW terhadap Perekonomian Indonesia = Impact Analysis of 10.000 MW Power Plant Development Against Indonesia's Economy

David Kurniawan; Nuzul Achjar, supervisor; Komara Djaja, examiner; Walandouw, Paksi Cattra Kamang, examiner (Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2012)

 Abstrak

Investasi di bidang ketenagalistrikan adalah salah satu faktor yang sangat penting untuk menjamin tersedianya tenaga listrik dalam jumlah yang cukup yang dapat memenuhi permintaan pasokan. Dengan Kebijakan pemerintah dalam program percepatan pembangunan pembangkit listrik 10.000 MW yang tidak hanya bertujuan untuk mengatasi krisis listrik tetapi juga untuk mendorong perekonomian di Indonesia. Sumber daya primer yang melimpah di Indonesia khususnya batubara mencapai sebesar 104.9 milyar ton menjadi sumber energi utama penggerak pembangkit listrik 10.000 MW (PLTU) sehingga dapat menghasilkan energi yang dapat dijual sesuai dengan kapasitas masing-masing pembangkit.
Dengan menggunakan analisa model Inter Regional Input Output (IRIO) dapat diketahui hubungan antar sektor dan antar wilayah akibat adanya permintaan akhir sektor tertentu pada suatu wilayah sehingga dapat meningkatkan output dan pendapatan masyarakat. Dampak akibat pembangunan pembangkit listrik 10.000 MW terhadap perekonomian Indonesia dari kurun waktu 2011 sampai tahun 2014 dilihat dari peningkatan output berturut-turut sebesar 0,51%, 1,31%, 1,97% dan 2,34% dari output awal sebesar Rp. 5.081,29 triliun, sedangkan peningkatan pendapatan berturut-turut sebesar 0.42%, 0,99%, 1,45% dan 1,72% dari pendapatan awal sebesar Rp. 825,92 triliun. Sekaligus memiliki disparitas yang cenderung mengecil pada tahun 2014.

Investment in the electricity sector is on every important factor to ensure the availability of electricity in sufficient quantities to meet rising demand. With Government policy in the acceleration of 10,000 MW power project, which not only aims to overcome the power crisis but also to stimulate the economy in Indonesia. Primary resources are abundant in Indonesia, especially for coal reached 104.9 billion tons to the main energy source driving the 10,000 MW power plant (power plant) so as to generate energy that can be sold in accordance with the capacity of each plant.
By using the analysis model of the Inter Regional Input Output (IRIO) can be determined the relationship between sectors and between regions due to there cent demand for a particular sector in a region so as to increase output and incomes. Impacts due to construction of 10,000 MW power plant on the economy of Indonesia from the period 2011 to 2014, seen from the increased output respectively by 0.51%, 1.31%, 1.97% and 2.34% of initial output of Rp. 5081.29 billion, while revenue increased respectively by 0:42%, 0.99%, 1.45% and 1.72% of the initial income of Rp. 825.92 trillion. Well have a disparity that tends to shrink in 2014.

 File Digital: 1

 Metadata

Jenis Koleksi : UI - Tesis Open
No. Panggil : T31827
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Jakarta: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2012
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xiv, 138 pages : illustration ; 30 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T31827 15-19-519693098 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20315299
Cover