UI - Skripsi Membership :: Kembali

UI - Skripsi Membership :: Kembali

Kajian risiko Keselamatan dan Kesehatan Kerja (K3) pada proses produksi pabrik karet di Baranangsiang, Bogor tahun 2012 = Risk assessment of occupational health and safety at production process of rubber manufacturing in Baranangsiang, Bogor 2012

Yiyin Mariska; Dadan Erwandi, supervisor (Fakultas Kesehatan Masyarakat Universitas Indonesia, 2012)

 Abstrak

Penelitian ini membahas tentang kajian risiko keselamatan dan kesehatan kerja yang ada pada setiap tahapan dalam kegiatan proses produksi yang dilakukan di area pabrik pengolan pabrik karet di Baranangsiang, Bogor tahun 2012. Penilaian risiko dilakukan dengan menganalisis nilai consequences, exposure, dan probability dari setiap kegiatan proses produksi lalu dibandingkan dengan standar level risiko samikuantitatif W.T Fine J untuk mengetahui tingkat risiko yang dimiliki pada setiap kegiatan proses produksi.
Hasil penelitian menyatakan bahwa level risiko yang ada pada setiap kegiatan proses produksi meliputi very high, priority 1, Substansial, Priority 3 dan acceptable. Pada penelitian ini skor yang paling tinggi adalah 900 dan yang paling rendah adalah 10. Dari hasil analisis risiko yang diperoleh dapat digunakan sebagai bahan masukan kajian risiko di pabrik karet untuk menurunkan level risiko dengan menggunakan berbagai pengendalian.

This research discusses the risk assessment of occupational health and safety that exist in every steps at production process of rubber manufacturing in Baranangsiang, Bogor 2012. Risk assessment is done by analyzing the value of consequences, exposure, and probability in every steps of production process which is then compared to standard level of risk semi quantitative W.T. Fine to determine level of risk that exist at each stage of production process.
The result of research explain that level of risk which is exist in every steps of production process has different level is very high, priority 1, Substansial, Priority 3 dan acceptable. In this research the highest score is 900 and the lowest value is 10. Result of risk analysis obtained can be used as input in the risk assessment process in rubber manufacturing and to be able to lower the risk with using various risk controls.

 File Digital: 1

Shelf
 S44011 Kajian risiko.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Skripsi Membership
No. Panggil : S44011
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2012
Bahasa : ind
Sumber Pengatalogan :
Tipe Konten :
Tipe Media :
Tipe Carrier :
Deskripsi Fisik : xiv, 85 hlm. : ill. ; 28 cm. + lamp.
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
S44011 14-23-31258409 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20331552
Cover