Estimasi laba kotor proyek bangunan gedung berbasis bobot biaya langsung dengan metode fuzzy logic dan artificial neural network = Gross profit estimates of building project based on weight of direct cost with fuzzy logic method and artificial neural network

Hilda Jusuf; Yusuf Latief, supervisor (Fakultas Teknik Universitas Indonesia, 2012)

 Abstrak

Estimasi biaya merupakan kunci kesuksesan suatu proyek dari tahap konsep hingga tahap akhir. Dua komponen yang terdapat dalam estimasi biaya adalah biaya langsung dan biaya tidak langsung. Biaya langsung memegang peranan yang penting karena besarnya dominan terhadap total biaya. Efisiensi pada biaya langsung dapat berpengaruh terhadap laba kotor proyek. Dengan menggunakan data historis proyek, bobot laba kotor akan diketahui berdasarkan bobot biaya langsung yang ada. Metode yang digunakan dalam penelitian ini adalah Fuzzy Logic dan Artificial Neural Network menggunakan Matlab. Dari penelitian yang dilakukan, diketahui bahwa untuk proyek kampus, ANN memberikan hasil yang lebih akurat. Dengan menggunakan hasil ini, simulasi telah dilakukan dan diperoleh range laba kotor proyek sebesar (13,51-14,69%). Sementara itu range untuk komponen biaya langsungnya (25,93-34,13%) untuk biaya upah; (45,71-56,11%) untuk biaya bahan; (27,61-43,90%) untuk biaya subkontraktor; (5,74-14,3%) untuk biaya peralatan; dan (9,08-12,19%) untuk biaya overhead proyek. Sedangkan untuk proyek kantor, Fuzzy Logic memberikan hasil yang lebih akurat. Dengan menggunakan hasil tersebut, simulasi telah dilakukan dan diperoleh range laba kotor sebesar (13,09-16,74%). Range biaya langsungnya (23,32-31,33%) untuk biaya upah; (44,47-53,08%) untuk biaya bahan; (37,47-48,99%) untuk biaya subkontraktor; (8,21-13,52%) untuk biaya peralatan; dan (11,87-16,09%) untuk biaya overhead proyek.

Cost estimate is the key to the success of a project from concept stage until the final stage. Two components are included in cost estimate are direct cost and indirect cost. Direct cost is important because of the large dominant to the total cost. Efficiency on direct cost can effecting gross profit project. With use historical data project, weight of gross profit will be known based on existing weight of direct cost. Methods used in this research are Fuzzy Logic and Artificial Neural Network with Matlab. From the research conducted, it is known that for college project, ANN produced more accurate output. With use this result, simulation have been done and obtained range of gross profit by (13,51-14,69%). While range components of direct cost are (25,93-34,13%) for wage cost; (45,71- 56,11%) for materials cost; (27,61-43,90%) for subcontractor cost; (5,74-14,3%) for equipment cost; and (9,08-12,19%) for overhead project cost. For office project, Fuzzy Logic gives more accurate result. With use this result, simulation have been done and obtained range of gross profit by (13,09-16,74%). Range components of direct cost are (23,32-31,33%) for wage cost; (44,47-53,08%) for materials cost; (37,47-48,99%) for subcontractor cost; (8,21-13,52%) for equipment cost, and (11,87-16,09%) for overhead project cost.

 File Digital: 1

Shelf
 S44719-Estimasi laba.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Skripsi Membership
No. Panggil : S44719
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2012
Bahasa : ind
Sumber Pengatalogan :
Tipe Konten :
Tipe Media :
Tipe Carrier :
Deskripsi Fisik : xvi, 167 hlm. : ill. ; 28 cm. + lamp.
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
S44719 14-23-04606310 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20332070
Cover