Penerapan critical chain project management pada project scheduling instalasi distributed control system = The implementation of critical chain project management on project scheduling installation distributed control system

Muhamad Faruq Syaikani; Teuku Yuri M. Zagloel, supervisor (Fakultas Teknik Universitas Indonesia, 2013)

 Abstrak

Perencanaan dan penjadwalan adalah tahap yang sangat penting dalam menentukan keberhasilan suatu proyek. Masalah yang sering terjadi dalam suatu proyek adalah keterlambatan pekerjaan karena ketidaksesuaian antara rencana awal dengan realisasi pelaksanaan proyek.
Penelitian ini bertujuan untuk menerapkan Metode Critical Chain Project Management (CCPM) dalam mencari solusi optimalisasi dalam segi waktu proyek. Penelitian ini menganalisis penjadwalan proyek instalasi DCS dengan metode CCPM terhadap penjadwalan yang telah ditetapkan oleh pihak manajemen proyek untuk mengetahui durasi optimal proyek dengan memperhitungkan hubungan keterkaitan pekerjaan, 50% probabilitas, kendala sumber daya, jalur kritis, project buffer dan feeding buffer.
Hasil dari pengembangan penjadwalan dengan metode critical chain dapat mengoptimalkan jadwal karena menghilangkan waktu pengaman pada setiap pekerjaan sehingga didapat waktu penyelesaian proyek menjadi 279.75 hari dari penjadwalan sebelumnya yaitu 285 hari. hal ini juga dapat mengantisipasi kebiasaan buruk seperti student's syndrome.

Planning and scheduling are very important stage in determining the success of a project. A problem that often occurs in project is project lateness due to the mismatch between the first schedule plan and realization in project implementation.
This research aim to implementing the critical chain project management (CCPM) to find a solution in term of optimization of project time. This study analyzes the Project Scheduling Installation of DCS with scheduling of the CCPM method which has been established by the management of the project to find out the optimal duration of project. The indicators used to calculate the project can be implemented are the corresponding relationships between activity, change duration with 50% probability, resource constraints, critical chain, project buffer and feeding buffer.
The result of the development of scheduling with critical chain method can optimize the schedule because it eliminates a safety time on every job so come by the time the completion of the project becomes 278.75 days from the previous scheduling that was 285 days. It also can anticipate a bad habit such as student's syndrome.

 File Digital: 1

Shelf
 S44400 Penerapan critical.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Skripsi Membership
No. Panggil : S44400
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2013
Bahasa : ind
Sumber Pengatalogan :
Tipe Konten :
Tipe Media :
Tipe Carrier :
Deskripsi Fisik : xv, 86 hlm. : ill. ; 28 cm. + lamp.
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
S44400 14-21-218448057 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20332120
Cover