Analisa hukum terhadap penyelesaian surplus material pada proyek pemerintah yang menggunakan kontrak standar FIDIC Plant Design Build : studi kasus pada proyek Contract Package No. 4 - West Java Distribution Pipeline di PT Perusahaan Gas Negara (Persero) Tbk. = Legal analysis upon the settlement of Surplus Material on a government porject using standard Contracts FIDIC Build Plant Plant Design : case study on the Project Contract Package No. 4-West Java Pipeline Distribution at PT Perusahaan Gas Negara (Persero) Tbk. / Fera Witanti Puspaningrum

Fera Witanti Puspaningrum,author; Miftahul Huda, supervisor; Nurul Elmiyah, examiner; Akhmad Budi Cahyono, examiner ([Publisher not identified] , 2013)

 Abstrak

ABSTRAK
Dalam pemulihan ekonomi akibat krisis moneter tahun 1998, pemerintah
Indonesia, menerima pinjaman luar negeri dari JBIC untuk pelaksanaan proyek
pemerintah melalui perjanjian penerusan pinjaman antara Pemerintah Pusat
Republik Indonesia dengan perusahaan- BUMD/BUMN. Hal ini diatur dalam
Peraturan Pemerintah Nomor 42 Tahun 1995 Tentang Bea Masuk, Bea Masuk
Tambahan, Pajak Pertambahan Nilai dan Pajak Penjualan Atas Barang Mewah
dan Pajak Penghasilan Dalam Rangka Pelaksanaan Proyek Pemerintah Yang
Dibiayai Dengan Hibah atau Dana Pinjaman Luar Negeri serta peraturan
pendukungnya. Peraturan ini mengatur tentang pembebasan seluruh kewajiban
bea masuk, bea masuk tambahan atas impor barang dan material serta seluruh
pajak terkait dengan pelaksanaan proyek pemerintah. Namun demikian peraturan
perundang-undangan yang ada terkait dengan impor barang dan material untuk
proyek pemerintah belum mengatur masalah yang kritikal yaitu kepemilikan
surplus material. Salah satu proyek yang mengalami masalah ini adalah Contract
Package No. 4 West Java Distribution Pipeline di PT Perusahaan Gas Negara
(Persero) Tbk, yang menyebabkan perselisihan antara pemilik pekerjaan dan
kontraktor. Kontrak tersebut menggunakan kontrak standar FIDIC Plant Design
Build, yang menganut sistem nilai kontrak lumpsum. Kontrak standar FIDIC
dipergunakan terkait dengan pinjaman luar negeri untuk Proyek CP-4. Tujuan dari
tesis ini adalah menganalisa penerapan peraturan perundang-undangan dan pasalpasal
dalam kontrak terkait permasalahan surplus material dengan menggunakan
metode studi kasus. Analisa penyelesaian surplus material tersebut menjadi topik
utama dalam penelitian yang menggunakan pendekatan yuridis normatif ini.
Pendekatan tersebut dilakukan untuk menganalisis data dalam menggambarkan
kepemilikan surplus material pada proyek pemerintah. Dengan penulisan ini
diharapkan dapat dibuat peraturan yang jelas mengenai surplus material dalam
proyek pemerintah sehingga permasalahan tersebut tidak terulang kembali.

ABSTRACT
In order to support the economic recovery due to the monetary crisis in 1998,
Indonesia Government has received foreign or offshore loans from JBIC to
develop the government projects through the subsidiary loan agreement between
the Government of Indonesia with the state-owned companies BUMD/BUMN.
The development of government projects is ruled within Government Regulation
Number 42 Year 1995 regarding Import Duties, Value Added Tax and Sales Tax
on Luxury Goods and Income Tax in The Framework of Implementation of
Government Projects Financed with Grant or Foreign Loan, and the other
supporting regulations. Such regulation is ruling about the exemption of all import
duties of goods and materials and all taxes related to development of government
project. However the existing prevailing regulation related to the imported goods
and materials for government project has not yet regulate the critical issue on the
surplus material. One of government project dealt with such issue is Contract
Package No. 4 West Java Distribution Pipeline in PT Perusahaan Gas Negara
(Persero) Tbk, which was caused dispute between the employer and the
contractor. Such contract is using standard contract FIDIC Plant Design Build
which is adhere the value system lumpsum contract. The standard contract FIDIC
was utilized due to the offshore loan for CP-4 project. The main objective of this
thesis is to analyze the implementation of provision or terms and conditions in the
related regulations and the Contract regarding the surplus material by using case
study method. The analysis of the completion of a surplus of the materials is the
main topic in the research that uses the juridical normative approach. Such
approach shall be use in data analysis to describe the ownership of surplus
material in the government project. Therefore within this thesis, it is being
expected that the government may issue a clear regulations regarding surplus
material in the government project, therefore these problems do not occur again in
the future.

 File Digital: 1

Shelf
 T32546-Fera Witanti Puspaningrum(unggahnya kehapus).pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T32546
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : [Place of publication not identified]: [Publisher not identified], 2013
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xi, 106 pages ; 28 cm
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T32546 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20335886
Cover