UI - Tesis Open :: Kembali

UI - Tesis Open :: Kembali

Analisis keekonomian sumur baru pada pengembangan lapangan gas tua: studi kasus pada lapangan X = The economical analysis of new wells on matured gas field development: A case study on field X

Ahmad Zuhal Fachri; Mohammad Hamsal, supervisor; Bagio Nugroho Karno, examiner; Harahap, Muslim Efendi, examiner (Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2010)

 Abstrak

Untuk memenuhi target produksi gas alam, VICO Indonesia mengoptimalkan lapangan gas tua yang ada dengan menerapkan strategi dan teknologi yang tepat. Berdasarkan forecast jumlah kandungan reservoirs yang ada, Lapangan X merupakan yang paling potensial unluk dieksploilasi. Namun tetap dibutuhkan analisis kelayakan investasi untuk mengetahui nilai ekonomis sumur-sumur yang akan dieksplorasi, yang meliputi aktititas mengidentitikasi rencana pengembangan sumur gas baru, perhitungan cash flow, analisis capital budgeting, Serta analisis sensilivitas untuk melihat pengaruh faktor fluktuasi cadangan gas atau produksi, harga pasar, maupun pembelanjaan modal terhadap rencana pengembangan sumur baru. Metode penelilian yang digunakan adalah studi kepuslakaan dan observasi perusahaan melalui Studi data intemal maupun eksternal perusahaan. Hasil analisis berdasarkan perhitungan NPV, IRR, dan Payback Period yang dilakukan memberikan kesimpulan bahwa investasi pada pengembangan 25 sumur baru di lapangan X masih sangat aktraktif secara ekonomis.

In order to meet natural gas production target, VICO Indonesia optimizes the existing matured gas field with the implementation of proper .strategy and technology. In accordance with the forecast of its reservoirs contents, the Field X is the most potential gas jield to be explored. But still, the investment feasibility analysis to determine the economic value ofthe gas wells to be explored is critically needed, which includes activities such as identification of new gas well development plan, cash flow calculations, capital budgeting analysis, and sensitivity analysis to oversee the influences of fluctuating factors, such as gas reserves or production, market price, and capital expenditure of the new wells development plan. The research methodology involves literature studies and company observations through the study of company 's internal and external data. The result of analysis with NPK IRR, and Payback Period calculation methods concludes that the investment of the development of 25 new gas wells in Field X is still economically attractive.

 File Digital: 1

 Metadata

Jenis Koleksi : UI - Tesis Open
No. Panggil : T33409
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Program Studi :
Penerbitan : Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2010
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xiii, 75 pages : illustration ; 30 cm. + Appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T33409 15-19-075261557 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20341676
Cover