UI - Skripsi Membership :: Kembali

UI - Skripsi Membership :: Kembali

Manajemen risiko keselamatan kerja pada pekerjaan bangunan atas di Proyek Pembangunan Jalan Layang Tol Bogor Outer Ring Road (BORR) Seksi 2A oleh PT. Wijaya Karya Tahun 2013 = Occupational safety risk management on construction of an upper structure on The Bogor Outer Ring Road (BORR) Elevated Highway Project Section 2A by PT. Wijaya Karya in 2013

Alifah Komaraningsih; Ridwan Zahdi Sjaaf, supervisor (Fakultas Kesehatan Masyarakat Universitas Indonesia, 2013)

 Abstrak

Pekerjaan bangunan atas merupakan salah satu tahap kegiatan dalam konstruksi pembangunan jalan layang, dimana banyak pekerjaan yang dilakukan di ketinggian menggunakan peralatan dan material kerja berat. Penelitian ini mengacu pada standar AS/NZS 4360:2004, dengan menggunakan analisis risiko semi kuantitatif. Yang meliputi penilaian risiko dasar dan penilaian risiko eksisting, yaitu dengan menganalisis nilai konsekuensi, pajanan, dan kemungkinan dari setiap tahap pekerjaan yang kemudian dibandingkan dengan standar level risiko semi kuantitatif W.T. Fine.
Berdasarkan penelitian yang telah dilakukan, tingkat risiko pada kegiatan pekerjaan bangunan atas di proyek pembangunan jalan layang tol Bogor Outer Ring Road (BORR) Seksi 2A oleh PT. Wijaya Karya tahun 2013 meliputi tingkat risiko very high, priority 1, substantial, priority 3, dan acceptable.

The upper structure erection is one of the phases of the flyover construction. Wherein, any works done at height are using heavy tools and materials. This research refers to the semi quantitative approach of AS/NZS 4360:2004 standard, includes the assessment of basic risk and existing risk, which is done by analyzing the consequences value, exposure value and the possibility value from each phases of working that is compared with the semi-quantitative risk level standard of W.T. Fine.
According to the research done, the risk level of the upper structure erection on the Bogor Outer Ring Road elevated highway flyover project section 2A by PT. Wijaya Karya in 2013 includes: very high risk level, priority 1 level, substantial level, priority 3 level and acceptable level.

 File Digital: 1

Shelf
 S52983-Alifah Komaraningsih.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Skripsi Membership
No. Panggil : S52983
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2013
Bahasa : ind
Sumber Pengatalogan :
Tipe Konten :
Tipe Media :
Tipe Carrier :
Deskripsi Fisik : xvi, 164 hlm.: ill.; 28 cm.
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
S52983 14-22-73917124 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20345586
Cover