UI - Skripsi Membership :: Kembali

UI - Skripsi Membership :: Kembali

Perancangan Tata Letak Fabrikasi Penunjang Galangan = The Layout Design Of Shipyard Fabrication Workshop

Muningrum; Sunaryo, supervisor; Yanuar, examiner; Hadi Tresno Wibowo, examiner; Mukti Wibowo, examiner (Fakultas Teknik Universitas Indonesia, 2013)

 Abstrak

Pertumbuhan kapasitas galangan di Indonesia yang tidak secepat pertumbuhan kapal menyebabkan ketidakmampuan galangan memenuhi kebutuhan reparasi dan pembangunan kapal baru. Hal ini merupakan salah satu faktor penghambat akan pemenuhan kebutuhan armada transportasi laut yang baik di indonesia. Untuk mengatasi hal tersebut maka pemerintah Kab.Tanggamus di Prov. Lampung berinisiatif membuat klaster industri perkapalan. Di klaster industry perkapalan kabupaten Tanggamus ini selain direncanakan adanya pembangunan galangan dan fasilitas penunjang klaster perkapalan yang umumnya ada, juga direncanakan konsep baru dimana proses fabrikasi pembuatan kapal yang biasanya dilakukan di galangan, dilakukan ditempat terpisah. Penunjang fabrikasi ini dapat mengakomodasi kebutuhan fabrikasi beberapa galangan. Dengan konsep ini diharapkan dapat dilakukan penghematan pada galangan dalam pengadaan alat serta peningkatan kualitas hasil produksi yang tinggi dapat tercapai dikarenakan pembagian kerja yang spesifik. Adapun tujuan perancangan ini adalah untuk mendapatkan tata letak fabrikasi yang optimal melalui perhitungan luas areal kerja dengan mempertimbangkan fasilitas yang ada didalamnya. Hasil perancangan berupa layout tata letak fabrikasi penunjang galangan yang optimal serta optimasi luas alokasi ruang sesuai dengan kebutuhan dan alur proses produksi.

One of the inhibiting factors to the good marine transportation in Indonesia is the development of shipyard capacity that isn’t as fast as the amount of ships. That factor causes an inability to meet the needs of ship repair and construction of the new ship building. To overcome that problem, Pemda Tanggamus made Tanggamus as the shipbuilding industry cluster. In this cluster, shipyards and other facilities that generally support the cluster will be built. Not only that, a new shipyard fabrication system concept is also planned to be built. In this new shipyard fabrication system, the fabrication work that is usually done in shipyard, is done in separate area. This central fabrication work is designed to be able to accommodate the fabrication work load of shipyards in Tanggamus. Due to the specific division of laboring, a high quality production can be achieved and savings in the procurement of machines is a fact. The goal of this layout design is to obtain an optimum layout design by considering the calculation of the work area and the facility that exist. The output of the design is a layout design and its allocation of the central fabrication work and its supported area.

 File Digital: 1

Shelf
 S47189-Muningrum.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Skripsi Membership
No. Panggil : S47189
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2013
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated
Tipe Carrier : volume
Deskripsi Fisik : xiii, 64 pages : illustration ; 30 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
S47189 14-23-58261489 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20346874
Cover