Kajian pra-implementasi enterprise resource planning (ERP) : studi kasus PT Probindo Artika Jaya = Pre implementation assessment of enterprise resource planning (ERP) : case study of PT Probindo Artika Jaya

Eri Dariato; Eko Kuswardono Budiardjo, supervisor (Fakultas Ilmu Komputer Universitas Indonesia, 2013)

 Abstrak

PT Probindo Artika Jaya menetapkan jika perusahaan akan membangun sistem pengawasan yang terintegrasi.Implementasi sistem pengawasan tersebut diwujudkan dalam bentuk Enterprise Resource Planning (ERP). Untuk suksesnya implementasi, fase pra-implementasi harus dilakukan dengan cermat. Salah satu faktor pentingnya pada fase pra-implementasi adalah penilaian kondisi perusahaan saat ini. Penelitian ini fokus untuk menilai kesiapan perusahaan (ERP Readiness) dalam mengimplementasi sistem ERP.
Penelitian ini menggunakan kerangka mottaghi (Mottaghi, 2010). Kerangka ini menggunakan logika fuzzy yang mampu menyederhanakan perhitungan dan menghasilkan hasil yang lebih presisi untuk data kualitatif seperti kesiapan implementasi perusahaan. Pengumpulan data diperoleh melalui proses wawancara dengan pihak top managementdan observasi. Critical Success Factor (CSF) pada kerangka ini berjumlah 27 yang dibagi kedalam tiga kategori yaitu faktor strategis, faktor taktis, dan faktor operasional. Hasil dari penelitian ini menyatakan bahwa nilaikesiapan perusahaan masih tergolong rendah. Perusahaan masih belum siap untuk mengimplementasi ERP.
Faktor yang terlemah pada perusahaan adalah faktor taktis, hal ini disebabkan belum efektifnya manajemen proyek, masih mengandalkan intuisi dalam menyusun komposisi tim, dan belum adanya penilaian terhadap resiko yang muncul. Perbaikan organisasi dilakukan dengan melakukan dokumentasi, standarisasi, dan evaluasi pada semua aktivitas yang terlibat baik yang sifatnya strategis, taktis ataupun operasional.

PT Probindo Artika Jaya decides to build an integrated monitoring system. The system is Enterprise Resource Planning (ERP). Excellence in pre-implementation will lead definitely to a successfull implementation. Assessing the readiness of the company for implementing ERP is part of pre-implementation phase. This research is focus to assess the readiness (ERP Readiness) of a company in implementing an ERP system.
This research using mottaghi framework(Mottaghi, 2010). This framework use fuzzy logic to simplify the calculation and finally leads to a more precise result to determine qualitative problems like readiness of a company for ERP implementation. Fact obtain through interviews with the top management and observation. CSF to assess the readiness classified in three categories of strategic, tactical and operational. According to this study, the readiness for ERP implementation of thiscompany was low.
The lowest factor in this company is tactical factor, it is because project management is not effective, using intuition to compose a team, and there is no risk assessment.Improvementsinthe organizationis done bydocumentation, standardization, andevaluationof allactivitiesthat areinvolved in bothstrategic, tacticaloroperational factors.

 File Digital: 1

Shelf
 TA-Pdf Eri Dariato.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tugas Akhir
No. Panggil : TA-Pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Ilmu Komputer Universitas Indonesia, 2013
Bahasa : ind
Sumber Pengatalogan :
Tipe Konten :
Tipe Media :
Tipe Carrier :
Deskripsi Fisik : xiii, 153 hlm. : ill. ; 28 cm. + Lamp.
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
TA-Pdf 16-24-87757764 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20350486
Cover