Analisa tekno ekonomi implementasi optical transport network otn technology pada penyelenggaraan jaringan backbone optik pada PT XYZ = Techno economic analysis of optical transport network otn technology of optical backbone network development in PT XYZ / Veny Sesanria

Veny Sesanria; Dadang Gunawan, promotor; Djamhari Sirat, examiner; Muhamad Asvial, examiner; Muhammad Surayanegara, examiner (Fakultas Teknik Universitas Indonesia, 2014)

 Abstrak

ABSTRAK
Perkembangan telekomunikasi yang sangat pesat menyebabkan
pertumbuhan jumlah pelanggan seluler terus meningkat sehingga trafik pun
meningkat namun ternyata tidak sebanding dengan cost dan power yang
dikeluarkan dan revenue yang diperoleh. Hal ini terjadi pada PT XYZ yang
merupakan salah satu operator telekomunikasi di Indonesia. Melihat kondisi
keuangan perusahaan saat ini, maka Tim Transmission Backbone harus jeli
menentukan teknologi yang akan digunakan untuk mereduksi CAPEX dan OPEX
sehingga bisa meningkatkan revenue. Di beberapa daerah di Sumatera saat ini
memiliki traffic demand yang besar. Selain itu juga adanya pertimbangan untuk
kebutuhan proteksi trafik skala besar di wilayah Sumatera. Namun jaringan
eksisting saat ini di dareag tersebut dan mayoritas Pulau Sumatera masih
menggunakan teknologi SDH dan traditional WDM sehingga tidak mampu
memenuhi kebutuhan tersebut. Akibatnya diperlukan pembangunan jaringan
backbone optik baru dengan teknologi baru yaitu OTN yang dengan kelebihankelebihannya
dapat membantu kondisi keuangan perusahaan namun tetap
memperhatikan kelebihan dalam sisi teknisnya.
Laporan tesis ini menganalisa tingkat profitabilitas dan tingkat risiko
investasi implementasi teknologi OTN pada penyelenggaraan jaringan backbone
optik di beberapa daerah di Sumatera menggunakan metode Analisa Tekno
Ekonomi. Implementasi teknologi OTN pada penyelenggaraan jaringan backbone
optik diharapkan dapat mereduksi nilai CAPEX, OPEX, serta dapat meningkatkan
revenue namun tetap mempertimbangkan kualitas jaringan yang dibangun.
Parameter yang digunakan dalam tesis ini adalah First Installed Cost
(FIC), Life Cycle Cost (LCC), Net Present Value (NPV), Internal Rate of Return
(IRR), dan Payback Period (PBP). Untuk periode investasi 5 tahun, kelima
parameter tersebut mengindikasikan kerugian bagi perusahaan. Namun jika
periode investasi diperpanjang menjadi 10 tahun, maka memberikan indikasi
untung bagi perusahaan. Jika dibandingkan dengan teknologi traditional WDM,
maka teknologi OTN mengindikasikan hasil yang lebih baik yang ditunjukkan
oleh kelima parameter yang digunakan. Berdasarkan analisa risiko, dapat
disimpulkan bahwa NPV berbanding lurus dengan tarif layanan dan total trafik,
tetapi berbanding terbalik terhadap nilai tukar Dollar, nilai OPEX, dan discount
rate. Dapat dismipulkan juga bahwa PBP berbanding lurus tarif layanan dan total
trafik tetapi berbanding terbalik dengannilai tukar Dollar dan OPEX. Sedangkan
discount rate tidak memberikan pengaruh apa-apa terhadap PBP investasi.

ABSTRACT
Telecommunication development causes rapid growth in the number of
mobile subscribers continues to increas, so that traffic growth has increased too.
But the increased of traffic growth is not balance to the cost incurred and the
power and revenue earned. This occurs in PT XYZ which is one of
telecommunication operator in Indonesia. Looking at this company financial
condition now, then Transmission Backbone team should determine which
technology will be used to reduced CAPEX, OPEX buat can increase revenue
with also best quality in network performance. Today, in some areas in Sumatera
have large traffic demands. There is also consideration for the need of large-scale
traffic protection accross Sumatera area. However, the existing network in that
areas is still using SDH technology. And existing network in Sumatera area in
majority is also still using SDH and traditional WDM technology that cannot meet
those needs. Consequently, it is required the development of new optical
backbone network with new technology is that with the OTN strenghts can help
the company’s financial condition but still consider the advantages of the
technical side.
This thesis analyze profitability analyze the level of profitability and the
level of investment risk of OTN technology implementation in optical backbone
network development in several areas in Sumatera using Techno-Economic
analysis method. The implementation of OTN technology From this analysis, it
will be known whether the OTN technology in optical backbone network
development is expected to reduce CAPEX and OPEX, and also can improve
revenue, but still considering quality of network that is built.
Parameters that are used in this tesis are First Installed Cost (FIC), Life
Cycle Cost (LCC), Net Present Value (NPV), Internal Rate of Return (IRR), dan
Payback Period (PBP). For investment period 5 years, all five parameters indicate
suffer a financial loss for company. However, if investment period is extended to
10 years, then all five parameters indicate profit for company. If it is compared
with traditional WDM technology, then OTN techonology indicates better result
that is showed from all five parameters. Based on the result of risk analysis, it can
be concluded that the sensitivity of NPV is proportional to the tariff and traffic,
but it is inversely related to Dollar exchange rate, OPEX, and discount rate. And it
also can be concluded that the sensitivity of PBP is propotional with tarif and
traffic, but is is inversly related to Dollar exchange rate and OPEX. But discount
rate not give any changes to PBP.

 File Digital: 1

Shelf
 T39363-veny_sesanria.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T39363
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Jakarta: Fakultas Teknik Universitas Indonesia, 2014
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xv, 92 pages : illustration. ; 30 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T39363 15-23-16872002 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20365334
Cover