UI - Skripsi Membership :: Kembali

UI - Skripsi Membership :: Kembali

Penilaian risiko keselamatan pada sistem perpipaan gas onshore di PT. X Sumatera tahun 2013 = Safety risk assessment for onshore gas pipeline system at PT. X Sumatera 2013

Herdina Jane Puspachinta; Zulkifli Djunaidi, supervisor; Doni Hikmat Ramdhan, examiner; Devie Fitri Octaviani, examiner (Fakultas Kesehatan Masyarakat Universitas Indonesia, 2014)

 Abstrak

Penilaian Risiko Keselamatan pada Sistem Perpipaan Gas Onshore di PT. X Sumatera Tahun 2013 dilakukan mengingat perlunya mengetahui tingkat risiko keselamatan pada proses pembangunan sistem perpipaan gas onshore ini dan daerah bertanah gambut yang banyak pepohonan dan sangat rentan terhadap kebakaran hutan yang akan mengancam keselamatan masyarakat di sekitar jalur pipa. Penelitian ini bersifat deskriptif analitik menggunakan metode analisis semi kuantitatif dengan tujuan untuk mendapatkan nilai dan tingkat risiko yang ada. Penilaian dilakukan menggunakan sistem skoring berdasarkan Model Studi Zulkifli Djunaidi.
Hasil penilaian menunjukkan bahwa nilai probabilitas dari sistem perpipa gas onshore yang diteliti adalah 36,21 pts dengan nilai konsekuensi sebesar 1,56 pts. Nilai risiko relatif didapatkan sebesar 26,62 pts yang termasuk kategori low risk berdasarkan Tabel Kriteria ALARP. Oleh sebab itu, tindakan perbaikan tidak perlu dilakukan namun disarankan untuk memelihara kualitas pengendalian yang sudah dilakukan untuk meminimalisasi risiko.

Safety Risk Assessment for Onshore Gas Pipeline System at PT. X Sumatera 2013 done because it is important to know the level of risk of this gas pipeline system which still under construction and the land has a peat soil with many trees and susceptive to fire. This can be really harmful to the society. This research is an analytical descriptive that uses semi-quantitative analytical method to get the score and level of this pipeline risk. This assessment uses scoring system based on Zulkifli Djunaidi’s Study Model.
The result shows that the probability’s score is 36,21 pts with consequences 1,56 pts. Based on ALARP Criteria Table, the level of risk is low with the score of relative risk is 1,56. Therefore, immediate control is not needed but need to maintain the quality of exising control in order to minimize the risk.

 File Digital: 1

Shelf
 S53157-Herdina Jane.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Skripsi Membership
No. Panggil : S53157
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2014
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xvi, 51 pages : illustration ; 30 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
S53157 S53157 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20367645
Cover