Penetapan tarif angkutan gas bumi melalui pipa dengan insentif IRR = The calculating of natural gas toll fee through pipe with incentive of IRR

Hari Purwito; Sommeng, Andy Noorsaman, supervisor; Sri Wahyu Purwanto, supervisor; Sutrasno Kartohardjono, examiner; Heri Hermansyah, examiner; Erie Soedarmo, examiner (Fakultas Teknik Universitas Indonesia, 2014)

 Abstrak

Indonesia adalah negara berkembang yang masih bergantung pada bahan bakar minyak. Gas bumi adalah salah satu sumber energi yang dapat digunakan sebagai bahan bakar alternatif masa depan Indonesia. Kondisi pipa trasnmisi gas di Indonesia masih terbatas. Indonesia membutuhkan jalur pipa baru. Proyek pembangunan jaringan pipa gas baru membutuhkan dana dari investor. Interest Rate of Return (IRR) merupakan metode tingkat pengembalian investasi suatu proyek. IRR pada proyek pembangunan jaringan pipa gas baru besarnya lebih kecil sekitar 2% daripada proyek sejenis. Kecilnya IRR pada proyek pembangunan pipa gas baru membuat investor tidak tertarik untuk berinvestasi.
Penelitian ini mengacu pada Peraturan Badan Pengatur Hilir Minyak dan Gas Bumi (BPH Migas) Nomor 8 Tahun 2013 Tentang Penetapan Tarif Pengangkutan Gas Bumi Melalui Pipa. Insentif Interest Rate of Return (IRR) hanya diberikan pada proyek jaringan pipa transmisi yang akan/sedang dibangun. Jalur pipa yang digunakan adalah Semarang-Cirebon. IRR dihitung dari Weighted Average Cost of Capital (WACC) ditambahkan insentif IRR. Tarif angkutan gas bumi ditetapkan berdasarkan target IRR. Investasi pipeline Semarang-Cirebon adalah sebesar US$ 351.011.043. Insentif IRR 2,40 % memeberikan keuntungan tambahan sebesar Rp 3.639.428.454/tahun dan kenaikan tarif angkutan gas bumi sebesar 1,53 %.

Indonesia is a development country which uses many oil fuels. Natural gas is one of Indonesian future alternative energy sources. Condition of transmission pipe in Indonesia is limit. Indonesian need many new transmission pipe routes. Project of a new pipe route need debt from many investors. Interest Rate of Return (IRR) is a method to calculating the interest rate from project infestation. The project has IRR which is too less than other typically project. The IRR makes investors don’t interest to give the capital of debt.
This study is based on Peraturan Badan Pengatur Hilir Minyak Dan Gas Bumi Nomor 8 Tahun 2013 Tentang Penetapan Tarif Pengangkutan Gas Bumi Melalui Pipa. Incentive of Interest Rate of Return (IRR) is only received to new project of transmission pipeline. That is located from Semarang up to Cirebon. Target of IRR is calculated from Weighted Average Cost of Capital (WACC) and incentive of IRR. Natural gas toll fee is determined from it. The result shows US$ 351.011.043 of total investment. The 2,40% of IRR’s incentive give increasingly Rp 3.639.428.454/year of profit and 1,53% of natural gas toll fee.

 File Digital: 1

Shelf
 S54780-Hari Purwito.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Skripsi Membership
No. Panggil : S54780
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2014
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resources
Deskripsi Fisik : xiv, 93 pages : illustration ; 30 cm
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
S54780 14-22-44589509 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20385564
Cover