UI - Skripsi Membership :: Kembali

UI - Skripsi Membership :: Kembali

Tinjauan faktor perilaku kerja tidak selamat pada pekerja konstruksi bagian finishing PT. Djasa Ubersakti Proyek Pembangunan Bogor Valley Residence dan Hotel Tahun 2014 = Review of unsafe behaviour factor on construction workers part of finishing in Project Development Bogor Valley Residence and Hotel PT. Djasa Ubersakti 2014

Megy Armada Putra; L. Meily Kurniawidjaja, supervisor; Dadan Erwandi, examiner (Fakultas Kesehatan Masyarakat Universitas Indonesia, 2014)

 Abstrak

Satu dari beberapa karakteristik proyek konstruksi yaitu berisiko tinggi kecelakaan kerja. Sebagian besar kecelakaan kerja yang terjadi disebabkan oleh adanya perilaku tidak selamat dalam bekerja. Tujuan penelitian adalah mengetahui faktor penyebab perilaku kerja tidak selamat untuk mencegah terjadinya kecelakaan kerja pada pekerja konstruksi di proyek pembangunan Bogor Valley Residence dan Hotel tahun 2014.
Penelitian ini merupakan studi deskriptif analitik dengan pendekatan semi kuantitatif. Populasi yang diteliti adalah pekerja bagian finishing sebanyak 70 orang. Metode pengambilan sampel menggunakan rumus uji hipotesis beda dua proporsi dengan besar sampel 65 responden. Desain penelitian cross sectional, observasi, kuesioner, wawancara dan analisis data menggunakan chi-square.
Hasil telitian menunjukkan bahwa mayoritas pekerja berperilaku kerja tidak selamat (53,8%). Ada hubungan yang signifikan antara persepsi tentang hambatan berperilaku kerja selamat, ketersediaan fasilitas keselamatan kerja, dan peraturan keselamatan kerja dengan perilaku kerja tidak selamat pekerja konstruksi.

One of several characteristics of construction projects that have a higher risk of accidents. Most of the work accident occurs due to the unsafe behavior in working. The purpose of the research was to determine the causes of workplace unsafe behavior to prevent work accidents at construction workers in the construction project Bogor Valley Residence and Hotel in 2014.
Research was a descriptive analytic study with semi-quantitative approach. The population be researched was part of finishing as many as 70 workers. The sampling method used was to test the hypothesis using two different formulas proportions with a sample size of 65 respondents. Desaign of research were cross-sectional, observation, questionnaires, interviews and data analysis using chi-square.
The results show that the majority of workers have unsafe behavior (53.8%). There is a significant relationship between perceptions of barriers to safe work behavior, availability of safety facility, and the safety regulations with unsafe behavior of construction workers.

 File Digital: 1

Shelf
 S55292-Megy Armada Putra.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Skripsi Membership
No. Panggil : S55292
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2014
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resources
Deskripsi Fisik : xvii, 86 pages : illustration ; 30 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
S55292 14-18-450940582 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20385699
Cover