UI - Skripsi Membership :: Kembali

UI - Skripsi Membership :: Kembali

Analisis dampak risiko investasi pembangunan sistem penyediaan air minum spam terhadap nilai finansial proyek dengan menggunakan project risk management = Risk impact analysis on investment for drinking water supply system development project towards financial value using project risk management

Wulan Maulidiah; Boy Nurtjahyo Moch., supervisor; Amalia Suzianti, examiner; Armand Omar Moeis, examiner; Sofrida Rosita Hanum, examiner (Fakultas Teknik Universitas Indonesia, 2014)

 Abstrak

Pertumbuhan penduduk yang pesat diiringi dengan pembangunan infrastruktur pendukung pariwisata yang tidak terkontrol di daerah Bali Selatan berakibat pada persediaan air bersih yang kian menipis. Melihat kondisi tersebut, Pemerintah Provinsi Bali saat ini mengembangkan proyek pembangunan Sistem Penyediaan Air Minum (SPAM) dengan cakupan wilayah Denpasar, Badung, Gianyar, Tabanan, dan Klungkung. Proyek pembangunan SPAM ini membutuhkan biaya investasi yang sangat tinggi sehingga perlu adanya analisis berbasis risiko untuk mengurangi kemungkinan terjadinya kegagalan proyek baik dalam aspek operasional maupun pendanaan. Penelitian dilakukan dengan menggunakan metode Project Risk Management dengan pendekatan Value at Risk (VaR) untuk menghitung dampak risiko terhadap investasi. Output penelitian ini berupa model risiko finansial yang kemudian dianalisis untuk menyusun rekomendasi rencana penanganan risiko yaitu berupa keputusan untuk mencegah, mitigasi, atau menerima risiko yang mungkin akan terjadi. Hasil analisis menunjukkan bahwa dari tiga faktor risiko yang menjadi prioritas, risiko fluktuasi nilai tukar Rupiah terhadap U.S. Dollar memiliki pengaruh yang paling besar terhadap nilai arus kas bersih proyek.

Rapid population growth aligned with the uncontrolled development of tourism facilities leads South Bali to the depletion of clean water supply. According to this condition, Bali Provincial Government is currently developing a drinking water supply project that will cover area of Denpasar, Badung, Gianyar, Tabanan, and Klungkung. The construction of water supply system requires a high investment costs which then resulted in the need of risk-based analysis to reduce the likelihood of failure in both the operational and financial aspects of the project. The study was conducted by using Project Risk Management method with Value at Risk approach to calculate the impact of risks in project investment. The output of the research is a financial risk model which is then analyzed to develop a risk responses planning which provides an alternative decision whether to avoid, mitigate, or accept the risks that might occur. The analysis showed that of the three prority risk factors, exchange rate has the greatest influence on the net present value of the project.

 File Digital: 1

Shelf
 S57627-Wulan Maulidiah.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Skripsi Membership
No. Panggil : S57627
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2014
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; Computer (rdadontent)
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xiii, 77 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
S57627 14-22-31340082 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20386275
Cover