UI - Skripsi Membership :: Kembali

UI - Skripsi Membership :: Kembali

Analisis pelaksanaan sistem manajemen keselamatan dan kesehatan kerja di proyek pembangunan Bogor Valley residence and hotel tahun 2014 = Analysis of implementation occupational health and safety management system in construction project Bogor valley residence and hotel 2014

M. Rohmat Fakhrurrozi; L. Meily Kurniawidjaja, supervisor; Chandra Satrya, examiner; Junet Eryanto, examiner (Fakultas Kesehatan Masyarakat Universitas Indonesia, 2014)

 Abstrak

Perkembangan konstruksi yang semakin meningkat mempunyai risiko tinggi terhadap kecelakaan kerja. Sistem manajemen keselamatan dan kesehatan kerja sebagai sarana mencegah terjadinya kecelakaan dan kerugian lainnya yang ditimbulkan. Tujuan penelitian adalah mengetahui pelaksanaan SMK3 melalui analisis temuan ketidaksesuaian hasil audit eksternal OHSAS 18001 dibandingkan dengan PP RI no.50 tahun 2012 di proyek pembangunan Apartemen Bogor Valley Residence dan Hotel tahun 2014. Penelitian ini merupakan studi deskriptif analitik. Metode pengambilan data melalui wawancara dengan 3 informan dan data sekunder.
Hasil telitian menunjukkan bahwa tingkat penerapan SMK3 di PT X menurut PP RI no.50 tahun 2012 sebesar 96,9%, yang merupakan tingkatan lanjutan yang harus dipertahankan atau ditingkatkan. Sedangkan penyebab temuan audit adalah tidak adanya peralatan alat ukur, tidak adanya SOP penanganan bahan kimia, perencanaan program yang tidak tepat, tidak adanya SOP perbaharui dokumen, dan terakhir yaitu kurangnya pengawasan/inspeksi area berbahaya. Secara keseluruhan penyebab temuan adalah kurangnya dukungan dan partisipasi aktif dari manajemen baik Pusat maupun proyek terhadap program K3.

The development of the growing construction have a high risk of work accidents. Occupational health and safety management systems as a means of preventing the occurrence of accidents and other damage caused. The purpose of this study is knowing the implementation of SMK3 through analysis OHSAS 18001 external audit results compared with PP RI No. 50/2012 on project development Bogor Valley Residence apartments and hotels. Design study is a descriptive analytic. Method of data acquisition through interviews with three informants and secondary data.
The results showed that the level of adoption research SMK3 in PT X by PP RI No. 50 of 2012 as much as 96.9%, which is an extension form should be preserved or enhanced. While the causes of the audit findings are not the tools of measurement, not the SOP chemical handling, improper planning program, not the SOP renew documents, and lack of supervision and inspection of hazardous areas. On the whole causes of the findings are the lack of support and active participation from top management and project management for K3 program.

 File Digital: 1

Shelf
 S56619-M. Rohmat Fakhrurrozi.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Skripsi Membership
No. Panggil : S56619
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2014
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xvii, 73 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
S56619 14-17-203272706 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20386478
Cover