Aplikasi penjadwalan linear scheduling dengan metode varying production rates pada proyek pembangunan breakwater di pelabuhan Kalibaru = Application of linear scheduling method with varying production rates at breakwater construction project in port of Kalibaru

Ledi Khalidannisa; Yusuf Latief, supervisor; Rully Andhika, supervisor; Setyo Supriyadi Sipadi, examiner; Petroceany, Jade Sjafrecia, examiner (Fakultas Teknik Universitas Indonesia, 2014)

 Abstrak

Pada proyek konstruksi breakwater sebagai komponen pembangunan di Pelabuhan Kalibaru metode penjadwalannya masih konvensional, yaitu dengan menggunakan kurva-S. Sementara, metode yang sesuai untuk pekerjaan repetitive seperti breakwater ini adalah linear scheduling. Dalam perkembangannya, linear scheduling method diteliti dengan berbagai pendekatan, salah satunya adalah pendekatan varying production rates (LSMVPR). Metode LSMVPR ini merupakan metode linear scheduling dengan mengembangkan kerangka untuk mengaplikasikan production rates dari sebuah pekerjaan. Pada penelitian ini ditemukan terdapat 9 faktor dominan dalam membuat model persamaan produktivitas breakwater di Pelabuhan Kalibaru. Sehingga dari model tersebut, kita dapat mengetahui kapan dan dimana variasi produktivitas tersebut terjadi, agar dapat lebih akurat dalam memprediksi jadwal kedepannya.

The scheduling method which is used for breakwater construction project as a buliding component in Port of Kalibaru is still convensional which is use S-Curve. While the relevan scheduling method for repetitive work such as breakwater is linier scheduling. Furthermore, liniear scheduling is researched by many approach. One of them is varying production rates (LSMVPR). This LSMVPR is scheduling method of liniear sheduling that developing framework to implement production rates from any work activity, so that LSMVPR to be a method that could be defining a productivity variation of a scheduling. In this research has found 9 dominant factor that we can develop productivity model at breakwater construction project in Port of kalibaru. So, using the model, we can know that when and where the variance in production rates has accoured, in order to more accurate predicted the schedule.

 File Digital: 1

Shelf
 S54905-Ledi Khalidannisa.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Skripsi Membership
No. Panggil : S54905
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2014
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; Computer (rdadontent)
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xix, 203 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
S54905 14-24-14680783 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20386629
Cover