UI - Skripsi Membership :: Kembali

UI - Skripsi Membership :: Kembali

Identifikasi faktor-faktor risiko terhadap kinerja waktu proyek rancang bangun design and build pada PT XXX yang ditinjau dari sisi pelaksana proyek = Identification of risk factors for time performance of design and build project at PT XXX that looked from contractor's side

Prilly Octavia; Yusuf Latief, supervisor; Setyo Suprijadi, examiner; Rully Andhika, examiner (Fakultas Teknik Universitas Indonesia, 2014)

 Abstrak

Mempercepat waktu pelaksanaan proyek merupakan salah satu faktor dipilihnya kontrak design and build, tetapi dalam pelaksanaannya masih terjadi keterlambatan. Penelitian ini bertujuan untuk mengidentifikasi faktor-faktor risiko yang berpengaruh terhadap kinerja waktu proyek design and build, dampak dan penyebabnya, serta tindakan atau respon apa yang dapat diterapkan untuk faktor-faktor risiko tersebut agar meminimalisir terjadinya keterlambatan pekerjaan design and build. Penelitian dilakukan dengan mengumpulkan data melalui survei kuesioner dan wawancara.Kemudian data tersebut dievaluasi dengan analisa deskriptif dan komparatif, uji validitas dan reliabilitas, serta analisa level risiko. Akhirnya, diperoleh 10 faktor risiko yang signifikan dalam mempengaruhi kinerja waktu proyek design and build, dampak dan penyebabnya, serta tindakan apa yang dapat dilakukan.

Fasting time of project is one of reason why design and build contract is selected, but in implementation still delay of work. This research has purpose to identify risk factors that influence time performance of design and build project, its cause and effect, and also treatment or response that can do for that risk factors to minimize the delay of design and build work. The research was conducted by collecting data through a survey questionnaire and interview. Then, evaluated by descriptive and comparative analyze, validity and reliability test, and also risk level analyze. Finally, acquired 10 risk factors that significant to influence time performance of design and build project, its cause and effect, and also treatment can be done.

 File Digital: 1

Shelf
 S56689-Prilly Octavia.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Skripsi Membership
No. Panggil : S56689
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2014
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xvi, 138 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
S56689 14-18-786973607 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20386853
Cover