UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Pengaruh penerapan sistem manajemen mutu dan manajemen keselamatan terintegrasi terhadap ketepatan waktu pelaksanaan pekerjaan konstruksi bagi kontraktor di Wilayah Jabodetabek = Implementation effect of integrated quality management and safety management system to execution timeliness of construction work for contractors in Jabodetabek region

Eddy Chandra; Krishna Mochtar, supervisor; Lilik Sumarliadi, supervisor; Yusuf Latief, examiner; Wisnu Isvara, examiner; Alin Veronika, examiner (Fakultas Teknik Universitas Indonesia, 2014)

 Abstrak

[ABSTRAK
Tesis ini membahas pengaruh penerapan sistem manajemen mutu dan manajemen
keselamatan terintegrasi, terhadap ketepatan waktu pelaksanaan pekerjaan
konstruksi bagi kontraktor yang berada di wilayah jabodetabek. Penelitian ini
adalah penelitian kuantitatif dengan jenis penelitian berupa survei. Hasil
penelitian menemukan bahwa kelengkapan dokumen perencanaan proyek,
pemahaman kontraktor akan dokumen QS, kesadaran pekerja akan QS, serta
fasilitas dan alat penunjang kegiatan QS dalam suatu penerapan sistem
manajemen mutu dan keselamatan yang terintegrasi secara serentak memberikan
pengaruh sebesar 77.6% terhadap waktu pelaksanaan pekerjaan.

ABSTRACT
This thesis are reviewing the implementation effect of the integrated quality
Management and safety Management System to execution timeliness of
construction work for contractor at the Jabodetabek Region. This research is a
quantitative study with a type of survey research. The results found that the
completeness of project planning documents, contractor understanding to QS
documents, awareness of workers to QS, as well as facilities and supporting tools
to QS activities within an application of integrates quality and safety
Management System gave impact of 77.6 % to the execution time job;This thesis are reviewing the implementation effect of the integrated quality
Management and safety Management System to execution timeliness of
construction work for contractor at the Jabodetabek Region. This research is a
quantitative study with a type of survey research. The results found that the
completeness of project planning documents, contractor understanding to QS
documents, awareness of workers to QS, as well as facilities and supporting tools
to QS activities within an application of integrates quality and safety
Management System gave impact of 77.6 % to the execution time job, This thesis are reviewing the implementation effect of the integrated quality
Management and safety Management System to execution timeliness of
construction work for contractor at the Jabodetabek Region. This research is a
quantitative study with a type of survey research. The results found that the
completeness of project planning documents, contractor understanding to QS
documents, awareness of workers to QS, as well as facilities and supporting tools
to QS activities within an application of integrates quality and safety
Management System gave impact of 77.6 % to the execution time job]

 File Digital: 1

Shelf
 T42615-Eddy Chandra.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T42615
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Jakarta: Fakultas Teknik Universitas Indonesia, 2014
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xiv, 120 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T42615 15-17-526955490 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20390190
Cover