UI - Tugas Akhir :: Kembali

UI - Tugas Akhir :: Kembali

Analisis tingkat kematangan manajemen proyek: studi kasus Pusintek Kementerian Keuangan = The analysis of project management maturity level: a case study Pusintek Ministry of Finance

Aulia Fauziyah; Wahyu Catur Wibowo, supervisor; Denny, supervisor; Petrus Mursanto, examiner; Indra Budi, examiner (Fakultas Ilmu Komputer Universitas Indonesia, 2015)

 Abstrak

Perkembangan implementasi teknologi informasi dan komunikasi TIK di bidang kepemerintahan saat ini semakin meningkat pesat baik untuk peningkatan kinerja internal organisasi maupun untuk peningkatan kualitas layanan publik Kementerian Keuangan merupakan salah satu lembaga pemerintah yang melakukan banyak perbaikan dalam penerapan TIK untuk mendukung pencapaian pengelolaan keuangan yang kredibel dan akuntabel Untuk mendukung hal tersebut Pusat Sistem Informasi dan Teknologi Keuangan Pusintek yang merupakan unit TIK pusat di lingkungan Kementerian Keuangan melakukan banyak proyek TIK Penelitian ini dilakukan untuk mengevaluasi dan menganalisis tingkat kematangan pelaksanaan manajemen proyek di Pusintek Kementerian Keuangan Model kematangan yang digunakan adalah Project Management Maturity Model PMMM yang disesuaikan dengan Project Management Body of Knowledge PMBoK Hasil dari penelitian ini menunjukkan bahwa tingkat kematangan manajemen proyek di Pusintek Kementerian Keuangan adalah tingkat 2 Hal ini menunjukkan bahwa Pusintek telah memiliki kebijakan dan standar dalam pelaksanaan manajemen proyek Namun berdasarkan pemeriksaan dan observasi dokumen yang dilakukan penelitian ini pelaksanaan manajemen proyek belum sepenuhnya mengacu pada kebijakan tersebut Menurut PMMM tingkat 2 menunjukkan belum adanya konsistensi dalam pemahaman dan pelaksanaan manajemen proyek Penelitian ini juga memberikan beberapa rekomendasi yang dapat dilakukan oleh Pusintek Kementerian Keuangan untuk dapat mencapai kematangan tingkat 3 Rekomendasi mencakup beberapa aspek yaitu aspek kebijakan yang terdiri dari melakukan sosialisasi kebijakan dan menyusun beberapa prosedur yang dibutuhkan aspek sumber daya manusia yang terdiri dari memberikan pelatihan manajemen proyek evaluasi manajemen proyek dan manajemen program serta melakukan evaluasi dan pengukuran kinerja tim proyek serta aspek teknologi yang terdiri dari pemanfaatan tools atau sistem manajemen proyek.

The implementation of information and communication technology ICT in government today is growing rapidly both to improve the internal performance of the organization and to improve the quality of public services The Ministry of Finance is one of the government agencies that make a lot of improvements in the implementation of ICT to encourage the achievement of credible and accountable financial management To support this Pusat Sistem Informasi dan Teknologi Keuangan Pusintek which is the IT department of the Ministry of Finance did a lot of ICT projectsThis study was conducted to evaluate and analyze the maturity level of project management implementation in Pusintek Ministry of Finance Maturity model used is Project Management Maturity Model PMMM which is adapted to the Project Management Body of Knowledge PMBOK The result of this study indicates that the project management maturity level in Pusintek Ministry of Finance is level 2 It means that Pusintek already have policies and standards in the implementation of project management However based on the evaluation and documents observation conducted by this study the implementation of project management have not been fully based on the policies According to PMMM level 2 shows the lack of consistency in the understanding and implementation of project management This study also provides some recommendations that can be done by Pusintek to achieve the maturity level 3 The recommendations are grouped into three aspects policy by disseminating the policy and developing the necessary procedures human resource by providing project management project management evaluation and management program training and evaluating and measuring the performance of the project team and technology by more using the project management tools and systems.

 File Digital: 1

Shelf
 TA-Aulia Fauziyah.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tugas Akhir
No. Panggil : TA-pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Ilmu Komputer Universitas Indonesia, 2015
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xii, 86 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
TA-pdf 16-18-981349355 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20405193
Cover