Perbandingan metode pelaksanaan pemasangan bekisting antara metode block out dengan metode konvensional pada pekerjaan kolom gedung bertingkat ditinjau dari segi biaya dan waktu = Comparation method formwork installation between block out method and conventional method on column installation of highrise building in cost and time’s prespective / Rahmat Hidayat

(Fakultas Teknik Universitas Indonesia, 2014)

 Abstrak

[Bekisting merupakan bagian yang menjadi unsur penting dalam suatu
proyek konstruksi gedung bertingkat karena menghabiskan biaya terbesar dalam
pekerjaan struktur bertingkat yang tipikal. Metode Block Out merupakan inovasi
yang dimiliki PT. PP yang menjadi pilihan dalam pekerjaan bekisting. Pada
penelitian ini akan dianalisa bagaimanakah perbandingan antara Metode Block Out
yang dimiliki PT. PP dengan Metode Bekisting Konvensional ditinjau dari segi
biaya dan waktu pada pekerjaan kolom. Data yang akan dianalisis didapatkan dari
narasumber yang menjadi praktisi di bidang konstruksi. Hasil dari penelitian ini
adalah metode out lebih murah dibandingkan metode konvensional dengan
penghematan Rp 567.721.928,19 atau Rp 113.544.385,64 / lantai sehingga efisiensi
biaya yang dapat dilakukan sebesar 20,6%. Metode block out lebih cepat
dibandingkan dengan metode konvensional dengan durasi 12 hari.
, Formwork is one part of high rise building construction that becomes an
important element of a project because it consumes the largest cost in a typical
multi-storey structural job. Block Out is a method innovated by PT. PP that can be
used as an option in doing formwork. This research will analyze the comparison
between Block Out Method and Conventional Formwork Method in cost and time’s
prespective when working on column installation. The data that will be analyzed
are obtained from sources who are practitioners in construction project. The
hypothesis of this study is that Block Out Method, compared to Conventional
Formwork Method, is cheaper in its construction cost and faster in its execution
time. The goal of this report is Block Out Method is cheaper than Conventional
Metode with thrift IDR 576.721.928,19 or IDR 113.544.385,64 / floor. So,
efficiently cost that could to apply is 20,6%. And, Block Out Method is faster than
Conventional Method that have 12 days duration]

 File Digital: 1

Shelf
 S57698-Rahmat Hidayat.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Skripsi Membership
No. Panggil : S57698
Program Studi :
Subjek :
Penerbitan : [Place of publication not identified]: Fakultas Teknik Universitas Indonesia, 2014
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xii, 107 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
S57698 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20408408
Cover