Pengembangan strategi implementasi building information modeling di Indonesia dari sudut pandang developer pemilik proyek = The Development of building information modeling strategy implementation in Indonesia from the perspective of developers owners

Yoga Irawan; Ayomi Dita Rarasati, supervisor ([Publisher not identified] , 2015)

 Abstrak

ABSTRAK
Banyak negara telah mengimplementasikan BIM dalam memajukan sektor indusri kontruksi. BIM merupakan generasi baru dari CAD yang mempermudah proses kontruksi dan terbukti dinegara maju BIM mampu meningkatkan produktivitas dan nilai dari proyek kontruksi. Namun di Indonesia masih sangat sedikit pengguna BIM, sehingga perusahaan harus mempersiapkan strategi untuk implementasi BIM.
Dalam penelitian dilihat dari sudut pandang developer telah dilakukan identifikasi mengenai kendala dan strategi yang telah di terapkan dalam proses implementasi BIM oleh salah satu developer di Indonesia dengan cara penyebaran kuisioner terbuka dan wawancara mendalam. Kemudian hasil dari identifikasi tersebut dikembangkan kembali dengan studi literature yang hasilnya digunakan untuk membuat urutan strategi implementasi BIM dibantu dengan instrument kuisioner tertutup. Hasil dari pembuatan urutan tersebut di olah kembali menjadi skema implementasi BIM yang bertujuan untuk menjadi acuan oleh developer di Indonesia dalam implementasi BIM.

ABSTRACT
Many countries have had BIM implementation in construction industry. BIM is new generation of CAD that simplify the process and has proven in developed countries BIM is able to increase productivity and value of construction projects. Howeer in Indonesia BIM user is very rare. Some company has to prepare the strategy for BIM implementation.
This research has looked by the perspective of developer, researcher identified the strategis to resolve constraint that have been applied in implementation processes of BIM by one of developer in Indonesia. Then the result of identification are developed and be adapted with study literature and the result would use as a input to create sequence of process aided by questionnaire. The sequence of process that have created by the researcher , will use to develope the scheme of BIM implementation that aim to be a reference for developers in Indonesia as guidance to implement BIM.

 File Digital: 1

Shelf
 T44707-Yoga Irawan.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T44707
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : [Place of publication not identified]: [Publisher not identified], 2015
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resources
Deskripsi Fisik : xx, 296 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T44707 15-19-418270429 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20414269
Cover