Pengendalian ruang lingkup berbasis risiko dari sisi kontraktor pada proyek EPC power plant untuk meminimalisir deviasi biaya akibat perubahan ruang lingkup = Risk based control scope from contractor s side on EPC power plant project to minimize cost deviation due to changes in scope
Miftah Faridh;
Yusuf Latief, supervisor; Radian Z. Hosen, supervisor; Eddy Subiyanto, examiner; Rosmariani Arifuddin, examiner; Khrisna Mochtar, co-promotor
(Fakultas Teknik Universitas Indonesia, 2015)
|
![]()
|
Collection Type : | UI - Tesis Membership |
Call Number : | T44360 |
Main entry-Personal name : | |
Additional entry-Personal name : | |
Study Program : | |
Subject : | |
Publishing : | Depok: Fakultas Teknik Universitas Indonesia, 2015 |
Cataloguing Source | LibUI ind rda |
Content Type | text |
Media Type | unmediated ; computer |
Carrier Type | volume ; online resource |
Physical Description | xv, 192 pages : illustration ; 28 cm + appendix |
Concise Text | |
Holding Institution | Universitas Indonesia |
Location | Perpustakaan UI, Lantai 3 |
Call Number | Barcode Number | Availability |
---|---|---|
T44360 | 15-22-54533750 | TERSEDIA |
Review: |
No review available for this collection: 20415125 |