UI - Skripsi Membership :: Kembali

UI - Skripsi Membership :: Kembali

Analisa kelayakan usaha pelabuhan di pulau bangka = Port feasibility study in bangka island

Zahra Nabila; Teuku Yuri M. Zagloel, supervisor; Inaki Maulida Hakim, examiner; Fauzia Dianawati, examiner; Isti Surjandari Prajitno, examiner (Fakultas Teknik Universitas Indonesia, 2016)

 Abstrak

Pelabuhan Pangkal Balam merupakan satu-satunya pelabuhan yang memiliki standard pelabuhan barang di Pulau Bangka yang menyebabkan 80% arus barang masuk dan keluar melalui pelabuhan ini. Namun didapati adanya dwelling time yang tinggi serta nilai customer service index yang kecil di pelabuhan Pangkal Balam. Maka didapati adanya potensi pembangunan pelabuhan baru di Pulau Bangka. Namun dalam membangun sebuah fasilitas baru, diperlukan kajian secara mendalam terhadap kelayakan investasinya. Tujuan dari penelitian ini berupaya untuk menganalisa kelayakan usaha pelabuhan dilihat dari aspek pasar, operasional, dan finansial. Metode yang digunakan dalam penelitian ini adalah metode Analisa Kelayakan Proyek untuk menilai kelayakannya, serta Analisis Sensitivitas untuk mengetahui variabel yang paling berpengaruh terhadap perubahan untuk mengurangi resiko ketidakpastian.
Hasil dari penelitian ini menunjukkan adanya potensi permintaan pasar terhadap pembangunan pelabuhan general cargo, gambaran layout untuk kapasitas kapal maksimal sebesar 3.000 DWT, matriks cashflow dengan hasil perhitungan Net Present Value (NPV), Internal Rate of Return (IRR), dan Payback Periode, serta didapati variabel-variabel pada cashflow yang paling sensitif diantaranya penurunan pendapatan, kenaikan pengeluaran, dan kenaikan nilai tukar rupiah. Hasil penelitian ini diharapkan dapat membantu stakeholder dalam membuat keputusan terhadap usaha pembangunan pelabuhan di Pulau Bangka.

Pangkal Balam is the only port that is considered appropriate and has a standard of a port in Bangka Island, which cause 80% of the flow of goods comes and goes through this port. However this port has a high dwelling time and small customer service index. It can be said that there is a potential to construct a new port. However, to build a new facility, an in depth study for the feasibility of investemnet is necessary. The purpose of this study sought to analyze the feasibility of the harbor from the market, operational, and financial aspects. The method used in this research is Feasibility Analysis to assess the feasibility, as well as Sensitivity Analysis to determine which variables are most influential on changes to reduce the risk of uncertainty.
The results of this study indicate the potential market demand for the construction of general cargo port, picture layout for vessel with maximum capacity 3.000 DWT, cashflow matrix along with calculation of Net Present Value (NPV), Internal Rate of Return (IRR), and Payback Period, also it found out that the most sensitive among variables in the cashflow are income, outcome, and the exchange rate. The results of this study are expected to help the stakeholders for making decisions on constructing a new port in Bangka Island.

 File Digital: 1

Shelf
 S63040-Zahra nabila .pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Skripsi Membership
No. Panggil : S63040
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2016
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resources
Deskripsi Fisik : xiii, 87 pages : illustration ; 29 cm
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
S63040 14-17-567464633 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20429306
Cover