Analisa nilai investasi proyek pembangunan pembangkit listrik 35.000 mw berdasarkan alternatif pemetaan pembangunan pembangkit listrik di Indonesia = Initial cost analysis of 35.000 mw power plant construction project in accordance to alternative mapping scenario of power plant construction projects in Indonesia

Silvia; Mohammed Ali Berawi; Ayomi Dita Rarasati, examiner; Setyo Supriyadi Sipadi, examiner ([Publisher not identified] , 2016)

 Abstrak

ABSTRAK
Proyek Pembangunan Pembangkit Listrik 35.000 MW direncanakan untuk meningkatkan pertumbuhan dan perekonomian di Indonesia. Nilai investasi yang dibutuhkan sebesar 814 Triliun Rupiah dengan komposisi 51% dari total pembangunan pembangkit listrik berada di wilayah Jawa-Bali . Untuk mengembangkan persebaran pembangunan Proyek 35.000 MW ini, diperlukan pembuatan alternatif pemetaan persebaran pembangunan pembangkit listrik berdasarkan kebutuhan energi di Indonesia. Proses pembuatan alternatif pemetaan menggunakan prediksi kebutuhan energi sampai tahun 2030 dengan melakukan pendekatan menggunakan metode regresi linear berganda dan analisa beban puncak. Sedangkan untuk perhitungan nilai investasi proyek 35.000 MW yang berdasarkan alternatif pemetaan menggunakan analisa benchmarking dan time value. Pada penelitian ini, didapatkan komposisi pembangunan pembangkit listrik di wilayah Jawa-Bali sebesar 33% dan di luar wilayah Jawa-Bali 67%, dengan total kebutuhan listrik Indonesia sebesar 35.380,64 MW dan nilai total investasi adalah sebesar Rp. 1.813.327.584.711.390,00.

ABSTRACT
The 35,000 MW Power Plant Construction Project is planned to increase development and economics of Indonesia. An 814 trillion-rupiah investment value is needed, which consists of 51% of the total investment, located in Java-Bali. To expand the development distribution of this 35,000 MW Project, the creation of an alternative distribution map of power plant construction based on energy use in Indonesia, is needed. The process of creating this alternative map using energy predictions until 2030, uses a linear regression and peak load analysis approach. However, to calculate the investment value of this 35,000 MW Project, based on the alternative mapping, benchmarking and time value analysis is used. The results of this research shows that 33% of total power plant construction is located in Java-Bali and 67% outside of Java-Bali, with Indonesia?s total energy consumption of 35,380.64 MW. The total investment value is Rp. 1,813,327,584,711,390.00.

 File Digital: 1

Shelf
 S65413-Silvia.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Skripsi Membership
No. Panggil : S65413
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : [Place of publication not identified]: [Publisher not identified], 2016
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resources
Deskripsi Fisik : xix, 187 pages : illustration ; 30 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
S65413 14-18-313967005 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20431275
Cover