ABSTRAK
Pada kondisi saat ini, jika beban puncak dibandingkan dengan daya mampu
pembangkit pada sistem kelistrikan wilayah Sumatera dengan menerapkan kriteria
cadangan 35%, maka diperkirakan terjadi kekurangan sekitar 2.000 MW. Sumber
gas bumi di wilayah Jambi dapat dipertimbangkan karena tersedia cadangan gas
dan dapat digunakan sebagai energi untuk memenuhi kebutuhan listrik. Gas tidak
mudah untuk disimpan dibandingkan dengan Bahan Bakar Minyak (BBM) yang
banyak digunakan sebagai bahan bakar pemenuhan beban puncak saat ini.
Compressed Natural Gas (CNG) dapat menjadi salah satu alternatif metode
penyimpanan gas. Kajian CNG Plant meliputi kajian keekonomian berupa NPV,
IRR dan Payback Period serta analisis sensitivitas yang menggambarkan
sensitivitas proyek terhadap faktor-faktor yang berpengaruh. Analisis teknik dari
CNG Plant juga dikaji untuk mendapatkan tekanan optimum pada CNG Plant
serta analisis perbandingan keekonomian antara CNG dan BBM jenis HSD. Dari
hasil perhitungan keekonomian didapatkan harga jual gas dari CNG Plant sebesar
US$ 10,4/MMBTU dengan tekanan optimum CNG sebesar 3215 psia.
Berdasarkan perhitungan didapatkan biaya pembangkit listrik tenaga gas dari
CNG plant yaitu sebesar Rp. 1.735,34/kWh, sedangkan biaya pembangkit listrik
tenaga diesel sebesar Rp. 2.765,55/kWh sehingga ada penghematan sebesar Rp.
1.030/kWh apabila digunakan gas CNG pada beban puncak. Potensi penghematan
dari sisi PLN apabila menggunakan gas CNG pada saat beban puncak adalah
sebesar Rp. 530 Juta/hari

ABSTRACT
In the current conditions, when compared the peak load with capable power
generator in Sumatera area electricity system, when applying the 35% reserved
criteria, it is predicted that there is a shortage of around 2,000 MW. Sources of
natural gas in Jambi region can be considered as available gas reserves and can be
utilized as energy to meet the electricity needs. Gas is not easy to be stored
compared with fuel oil which is widely used as fuel for the fulfillment of the peak
load now. Compressed Natural Gas (CNG) can be an alternative method of gas
storage. Study of CNG Plant was included the study of economics in the form of
NPV, IRR and Payback Period as well as a sensitivity analysis that illustrates the
sensitivity of the project on the factors that influence. Technical Analysis of CNG
also examined to obtain optimum pressure on the CNG Plant as well as the
economics of comparative analysis between CNG and fuel oil types HSD. From
the calculation results obtained economical gas price of CNG Plant amounted to
US $ 10.4/MMBTU with CNG optimum pressure of 3215 psia. Based on the
calculation, the cost of gas power plant of CNG plant is Rp. 1735.34/kWh, while
the cost of diesel power plant is Rp. 2765.55/kWh so that there is a savings of Rp.
1.030/kWh when used CNG gas at peak loads. Potential savings of PLN side
when using CNG gas during peak load is Rp. 530 Million/day

 File Digital: 1

Shelf
 T45763-Deri Januardi Djauhari.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T45763
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : [Place of publication not identified]: [Publisher not identified], 2016
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online source
Deskripsi Fisik : xv, 98 pages : illustration ; 30 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T45763 15-17-434081378 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20432586
Cover