Estimasi biaya kontingensi berdasarkan risk register proyek EPC minyak & gas = Estimating cost contingency based on risk register at epc oil & gas project / Iwan Daniel Gultom

Gultom, Iwan Daniel; Yusuf Latief, supervisor; Leni Sagita Riantini, examiner; Eddy Subiyanto, examiner; Setyo Supriyadi Sipadi, examiner ([Publisher not identified] , 2016)

 Abstrak

ABSTRAK
Pada proyek EPC Migas sering mengalami pembengkakan biaya yang diakibatkan tidak tepatnya perhitungan biaya kontingensi yang didasarkan kepada persentase
terhadap total biaya/estimasi proyek secara keseluruhan. Penelitian ini
menentukan pemodelan bagi estimasi biaya kontingensi dengan kombinasi range
estimating dan fuzzy logic untuk menentukan risiko terbesar dalam pengaruh dan
hubungannya terhadap besar nilai kontingensi pada proyek EPC berdasarkan risk
register (daftar yang berisikan risiko, mitigasi risiko,dampak serta frekuensi risiko
yang kemungkinan akan terjadi pada suatu proyek EPC) pada suatu pelaksanaan
proyek migas berdasarkan pengalaman yang telah dilaksanakan sebelumnya
oleh perusahaan R agar dapat menjadi referensi dalam penentuan besaran cot
contingency. Penentuan biaya kontingensi ini dengan range estimate dan
dilanjutkan dengan fuzzy logic dengan Matlab 2015a. Cost Contingency yang
didapat diaplikasikan dengan proyek yang diteliti dan sesuai dengan aktual
dengan penyimpangan yang cukup minim dengan asumsi risiko terbesar adalah
asumsi yang berubah, rework serta kompetensi yang kurang di dalam team proyek

ABSTRACT
EPC Oil & gas project always have cost overrun since the imprecise cost
contingency estimation which based on the percentage of the project total cost. In
the Oil & Gas EPC projects often experience cost overruns due to inaccurate
calculations contingency fee based on the percentage of the total cost / estimated
overall project. This study determines the modeling for the estimated costs of
contingency with a combination of range Estimating and fuzzy logic to determine
the greatest risk in influence and its relation to the great value of contingency on
EPC projects based on risk register (register containing risk, risk mitigation,
impact and frequency of risk that is likely to happen on a project EPC) at an oil
and gas project implementation based on the experience that has been carried out
previously by the company in order to be implemented as reference for
estimating cost contingency. Determining the cost of this contingency with a
range estimate and continued with fuzzy logic with Matlab 2015a. Cost
Contingency obtained was applied to projects studied and correspond to actual
deviations are quite minimal with bigger risks are changing of engineering
asumptions, re-work & lack of competence in project team

 File Digital: 1

Shelf
 T46212-Iwan Daniel Gultom.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T46212
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : [Place of publication not identified]: [Publisher not identified], 2016
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer (rdadontent)
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xvi, 235 pages : illustration ; 30 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T46212 15-18-758007303 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20433757
Cover