UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Peningkatan standar kompetensi estimator dalam usaha perolehan proyek terhadap kinerja hasil usaha pada PT. XYZ = Improved competency standards project estimator in the business acquisition on performance results of operations in PT. XYZ / Hari Winarto

Hari Winarto; Leni Sagita Riantini, supervisor; Eddy Subiyanto, supervisor; Yusuf Latief, examiner; Setyo Supriyadi Sipadi, examiner; Rossy Armyn Machfudiyanto, examiner ([Publisher not identified] , 2016)

 Abstrak

ABSTRAK
Perolehan proyek penting bagi kelangsungan industri jasa konstruksi. Estimator
adalah fungsi penting pada perusahaan engineering/konstruksi. Kompetensi
estimator dihadapkan dengan bagaimana keterampilan, pengetahuan dan perilaku
dari fungsi estimator tersebut. Tujuan penelitian untuk menganalisa pengaruh
kompetensi estimator berdasarkan tiga aspek : knowledge, skill dan personal
attributes terhadap perolehan proyek dan kinerja hasil usaha (omset kontrak) pada
salah satu perusahaan kontraktor BUMN. Penelitian ini menggunakan metode
analisa regresi linier berganda yang kemudian dilakukan analisa korelasi
Spearman dan analisa faktor untuk mendapatkan gap analysis kompetensi
dominan terhadap kompetensi estimator pada PT.XYZ, yang selanjutnya
dilakukan validitas akhir untuk proses pengembangan dengan respon pembuatan
modul pelatihan

ABSTRACT
Acquisition project paramount for the construction services industry. Estimator is
important function in the company's engineering/construction. Competence
estimator faced with how the skills, knowledge and behavior of the estimator
function. The research objective to analyze the effect of competence estimator
based on three aspects: knowledge, skill and personal attributes for the project
acquisition and performance results (turnover contract) on one of BUMN
construction company. This study uses multiple linear regression analysis,
Spearman correlation analysis and factor analysis to obtain a dominant
competency gap analysis on the competence estimator PT.XYZ, and then make an
end to the validity of the development process with response training module
manufacturing.;

 File Digital: 1

Shelf
 T46663-Hari Winarto.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T46663
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : [Place of publication not identified]: [Publisher not identified], 2016
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xiii, 162 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T46663 15-18-004851988 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20433778
Cover