UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Evaluasi sistem manajemen mutu proyek EPC dalam fase engineering produk detail engineering berbasis manajemen risiko pada PT. XYZ (studi kasus proyek boiler tank) = Evaluation of quality management system EPC project in engineering phase for detail engineering product based on risk management at PT XYZ (case study boiler tank project) / Shinta Theresia Manullang

Manullang, Shinta Theresia; Yusuf Latief, supervisor; Leni Sagita Riantini, examiner; Eddy Subiyanto, examiner; Setyo Supriyadi Sipadi, examiner ([Publisher not identified] , 2016)

 Abstrak

ABSTRAK
Tesis ini membahas mengenai evaluasi yang dilakukan mahasiswa terhadap
sistem manajemen mutu proyek EPC pada fase perancangan produk detail
engineering yang dikerjakan PT XYZ dengan berbasis manajemen risiko. Tujuan
dari penelitian ini adalah untuk mengetahui faktor-faktor dominan yang
mempengaruhi sasaran mutu fase engineering produk detail engineering.
Penelitian ini dilakukan dengan meneliti aktifitas-aktifitas yang dilakukan pada
proses bisnis dari PT XYZ. Faktor-faktor risiko yang mempengaruhi kinerja mutu
kemudian dianalisis dengan metode SPSS serta risk management.
Hasil dari penelitian ini menunjukkan bahwa terdapat 16 faktor-faktor risiko
dominan (dengan kategori risiko sedang dan tinggi) yang dapat mempengaruhi
kinerja mutu produk proyek EPC pada PT XYZ (studi kasus proyek boiler tank),
dengan risiko tertinggi yaitu X13 dan X37.

ABSTRACT
This thesis discuss about the student?s evaluation of quality management system
of detail engineering at EPC project at PT XYZ in the design phase ? based on
risk management. The purpose of this research is to knowing dominant factor
which can influence the quality performance of PT XYZ. This research conducts
by examine each activities in the business processes of PT XYZ. Based on those
activities, student has found the risk factors which influence the quality
performance of detail engineering?s product that has been produced by PT XYZ.
The outcome of this research shown there is 16 factors which can influence the
quality performance (medium and high category) of EPC project?s products by PT
XYZ (case study boiler tank project), and the highest risks are X13 and X37.

 File Digital: 1

Shelf
 T46817-Shinta Theresia Manullang.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T46817
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : [Place of publication not identified]: [Publisher not identified], 2016
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xviii, 192 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T46817 15-18-770646341 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20433801
Cover