Analisis rantai pasok bahan bakar pada operasi kontraktor pertambangan (studi kasus PT. PPN) = Analysis of fuel supply chain in mining contractor operation (case study PT. PPN)

Lopulalan, Ignatius Daniel; Harahap, Muslim Efendi, supervisor; Setyo Hari Wijanto, examiner; Ratih Dyah Kusumastuti, examiner ([Publisher not identified] , 2016)

 Abstrak

ABSTRAK
Penelitian ini dilakukan di PT PPN yang merupakan kontraktor pertambangan
batubara dengan studi kasus dilakukan pada lokasi pertambangan Barut yang terletak
di daerah Kalimantan Tengah. Di lokasi ini, rantai pasok bahan bakar, yang
sangat dibutuhkan untuk menjalankan operasi pertambangan sering mengalami
kendala karena permasalahan kondisi air sungai yang surut pada musim kemarau.
Tujuan penulisan ini adalah melakukan identifikasi dan analis terhadap pemborosan
yang terjadi untuk mendapatkan peluang efisiensi atas rantai pasok bahan bakar
yang saat ini dilakukan. Metodologi penelitian menggunakan data primer dan
sekunder dengan pendekatan Value Stream Mappinguntuk melihat pemborosan
yang terjadi dan melalui pola perhitungan fixed quantity model dilakukan perhitungan
optimalisasi penyimpanan dan transportasi baik secara waktu maupun biaya.
Pada saat musim hujan, rantai pasok melalui sungai merupakan pilihan yang terbaik
dari sisi waktu maupun biaya. Pada saat musim kemarau, alternatif melalui darat
dengan total biaya terendah dan waktu tercepat akan menjadi pilihan untuk pengiriman
bahan bakar ke Barut

ABSTRACT
This research was conducted at PT PPN, a coal mining contractor. The case study
was carried out at the mine site Barut in Central Kalimantan. At this location, the
fuel supply chain, which is necessary to run mining operations, frequently experienced
problem due to receding river water in the dry season. The purpose of this
thesis is to identify and analyze wastes that occur to gain efficiency improvement
over a fuel supply chain which is currently done. The research methodology uses
primary and secondary data with Value Stream Mapping approach to see the waste
that occurs in and through the pattern of fixed quantity calculation models to optimize
storage and transportation of both time and cost. During the rainy season, supply
chain through the river is the best option in terms of time and cost. In the dry
season, alternate overland with the lowest total cost and fastest time will be the
choice for the delivery of fuel to Barut.

 File Digital: 1

Shelf
 T-Ignatius Daniel Lopulalan.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T-Pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : [Place of publication not identified]: [Publisher not identified], 2016
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xii, 109 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T-Pdf 15-18-791087085 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20433940
Cover