Seleksi pemilihan unit pemisahan CO2 yang optimum di platform echo dari PT. X serta analisis keekonomiannya = Selection of the most optimum co2 removal unit in platform echo of PT. X and its economic analyses / Andradhita Rahmania Andini

Andradhita Rahmania Andini; Sutrasno Kartohardjono, supervisor; Yuswan Muharam, examiner; Tania Surya Utami, examiner; Mirza Mahendra, examiner ([Publisher not identified] , 2017)

 Abstrak

ABSTRAK
Permasalahan korosi yang disebabkan gas CO2 merupakan hal yang sangat dihindari pada industri minyak dan gas, karena korosi CO2 dapat menyebabkan kerusakan pada peralatan fasilitas, seperti terjadinya penipisan pada dinding pipa maupun vessel, bahkan menyebabkan kebocoran. Sistem perpipaan pada platform milik PT. X yang paling sering mengalami kebocoran adalah platform ECHO, terutama pada well string ESRA-2. Well string ini dikenal sebagai sumur yang menghasilkan gas dengan kandungan CO2 yang paling tinggi. Penelitian ini bertujuan untuk memilih opsi unit proses pemisahan CO2 yang paling ekonomis dan dapat dibangun di Platform ECHO untuk memisahkan kandungan CO2 dari gas keluaran well string ESRA-2. Opsi unit pemisahan CO2 yang dapat dipilih antara lain adalah instalasi teknologi membran serta sistem amina pada bagian discharge ECHO Compressor, instalasi teknologi CO2 removal dengan pelarut amina serta teknologi membran pada bagian suction ECHO Compressor serta gabungan instalasi proses membran dan sistem amina sebagai hybrid CO2 removal. Analisis keekonomian dilakukan terhadap ketiga proses diatas untuk mengetahui mengenai unit proses pemisahan manakah yang paling ekonomis. Berdasarkan hasil perhitungan keekonomian didapatkan bahwa opsi teknologi yang dianggap paling ekonomis adalah opsi-2A yaitu instalasi teknologi CO2 removal dengan pelarut amina serta teknologi membran pada suction ECHO Compressor dimana hasil nilai IRR serta NPV yang didapatkan adalah sebesar 16 serta U D 11,600,000.

ABSTRACT
Corrosion problems in oil and gas industry because of CO2 content in gas is anticipated. Sweet corrosion because of CO2 content will cause deterioration in facilities, in form of internal thinning of piping and vessel, and also leak. One of platform in PT. X, has undergone leaks several times, especially in ESRA 2. This well string is well known of its high content of CO2 gas. This work presented talks about the selection of CO2 removal technologies which will be built in ECHO Platform to separate CO2 gas from outlet gas of ESRA 2 well string. The options are installation of membrane technology and amine system technology in discharge of Echo Compressor, installation of amine CO2 removal plant and membrane system in suction Echo Compressor, and also hybrid process of amine system and membrane process as CO2 removal unit. The goal is to choose the best CO2 removal which will be able to produce outlet gas as piping specification. Economic analyses will also be taken into consideration in choosing which process seen attractive in economic. Based on economic calculation, the most optimum CO2 removal unit option is the installation of amine plant in suction of ECHO Compressor, which IRR and NPV value is 16 and U D 11,600,000.

 File Digital: 1

Shelf
 T46864-Andradhita Rahmania Andini.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T46864
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : [Place of publication not identified]: [Publisher not identified], 2017
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : viii, 183 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T46864 15-18-794849030 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20445819
Cover